Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a pipeline in San Antonio, Texas. Completed plans call for site work for a pipeline.
Company shall be responsible for installing electric and gas residential services in accordance with CPS Energy guidelines. CPS Energy guidelines dictate that, from the day of the request for underground electric/gas service, there will be twenty-one (21) days allowed to have a CPS Energy meter installed. This requires the underground electric/gas service to be completed in within ten (10) working days. This timeline must be adhered to NO EXCEPTIONS. Scope of work shall include installation of electric and gas services to new homes. Company shall provide trenching, conduit installation, telephone and/or cable conduit installation, backfilling with quality backfill material, and pulling of service wire. In cases where gas service is installed, Company shall install service from service stub or tap into gas main when no service stub is available. Butt fusing will be used when splicing gas pipe. Company will be responsible for white lining, obtaining locates, and providing sufficient personnel to implement and maintain procedures that will insure installation of services and all paperwork is completed in a timely manner. Company will be responsible for all paperwork relative to services i.e., gas meter cards, maps, job packages, customer notices etc. After completion of service work all paperwork will be turned in by 9:00 AM the following day. NO EXCEPTIONS. Scope of work involves entry into energized URD pad mount transformers and or secondary enclosures. Company will be responsible for the training of their crews and providing all documentation/certification of same. Company will be responsible for obtaining Class 3 rubber gloves to be worn whenever opening or working inside an energized pad mount transformer or secondary enclosure. CPS Energy will provide rubber blankets. Company will conform with all OSHA regulations relative to working near energized equipment. CPS Energy will provide all material necessary to install gas and electric services. Deadline for Respondent's Questions By 5:00 p.m. (Central time) on August 14, 2024 An automatic email containing a blank W9 Tax ID-Form and Business Questionnaire will be sent to the email address provided. Complete these forms and return to supplierdevelopment@cpsenergy.com for processing. Once the forms have been returned, a Supplier Diversity representative will send you a completion email outlining the newly created vendor information. Contact our Supplier Diversity office with any questions you may have. Email: supplierdevelopment@cpsenergy.com Phone: (210) 353-2474 *Please note if the question by date has passed, no further questions can be submitted. All bids will need to be submitted by the bid due date
Post-Bid
Pipeline
$840,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 5, 2024
April 1, 2025
Multiple Locations, San Antonio, TX
Related To This Project
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
Bid Date: Sep 26 2024
San Antonio, TX
--
San Antonio, TX
Bid Date: Sep 17 2024
San Antonio, TX
Bid Date: Sep 03 2024
San Antonio, TX
Bid Date: Sep 27 2024
San Antonio, TX
Bid Date: Sep 26 2024
San Antonio, TX
Bid Date: Sep 26 2024
San Antonio, TX
Bid Date: Sep 27 2024
San Antonio, TX
Bid Date: Aug 28 2024
San Antonio, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.