BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a pipeline in San Antonio, Texas. Completed plans call for site work for a pipeline.

Company shall be responsible for installing electric and gas residential services in accordance with CPS Energy guidelines. CPS Energy guidelines dictate that, from the day of the request for underground electric/gas service, there will be twenty-one (21) days allowed to have a CPS Energy meter installed. This requires the underground electric/gas service to be completed in within ten (10) working days. This timeline must be adhered to NO EXCEPTIONS. Scope of work shall include installation of electric and gas services to new homes. Company shall provide trenching, conduit installation, telephone and/or cable conduit installation, backfilling with quality backfill material, and pulling of service wire. In cases where gas service is installed, Company shall install service from service stub or tap into gas main when no service stub is available. Butt fusing will be used when splicing gas pipe. Company will be responsible for white lining, obtaining locates, and providing sufficient personnel to implement and maintain procedures that will insure installation of services and all paperwork is completed in a timely manner. Company will be responsible for all paperwork relative to services i.e., gas meter cards, maps, job packages, customer notices etc. After completion of service work all paperwork will be turned in by 9:00 AM the following day. NO EXCEPTIONS. Scope of work involves entry into energized URD pad mount transformers and or secondary enclosures. Company will be responsible for the training of their crews and providing all documentation/certification of same. Company will be responsible for obtaining Class 3 rubber gloves to be worn whenever opening or working inside an energized pad mount transformer or secondary enclosure. CPS Energy will provide rubber blankets. Company will conform with all OSHA regulations relative to working near energized equipment. CPS Energy will provide all material necessary to install gas and electric services. Deadline for Respondent's Questions By 5:00 p.m. (Central time) on August 14, 2024 An automatic email containing a blank W9 Tax ID-Form and Business Questionnaire will be sent to the email address provided. Complete these forms and return to supplierdevelopment@cpsenergy.com for processing. Once the forms have been returned, a Supplier Diversity representative will send you a completion email outlining the newly created vendor information. Contact our Supplier Diversity office with any questions you may have. Email: supplierdevelopment@cpsenergy.com Phone: (210) 353-2474 *Please note if the question by date has passed, no further questions can be submitted. All bids will need to be submitted by the bid due date

Post-Bid

Pipeline

$840,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
25
Bidding Soon
1,953
All Active Projects
762
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2024

April 1, 2025

img_map_placeholder

Multiple Locations, San Antonio, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.