BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Alvarado, Texas. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

**As of November 25, 2024 this project has not yet been awarded. A timeline for award has not yet been established. Back Use of this site is governed by our Terms of Use agreement. If you have any questions please send an email to the administrator. The work included in this Section consists of the furnishing of all labor, instruments, tools and services required in connection with the Testing, Adjusting and Balancing (TAB) of the Heating, Ventilating and Air Conditioning (HVAC) systems as described in the mechanical specifications and shown on the mechanical Drawings, or reasonably implied therefrom, to include the overall commissioning of systems and subsystems such as verification of operation of each control device and all equipment sequences of operation. B. TAB of the HVAC systems will be performed by an impartial Technical Firm who is a member of the Associated Air Balance Council (AABC) and whose operations are limited only to the field of professional TAB work. TAB firm shall be selected by owner and general contractor shall include the allowance noted in the front-end proposal requirements and shall pay the associated TAB firm from this allowance. C. TAB Firm is responsible to and shall submit all reports directly to the Architect/Engineer and Owner. D. TAB services shall result in the optimum temperature, humidity, airflow, pressurization, ventilation rates, and noise levels in the conditioned spaces of the building. E. The following basic components of the HVAC systems shall be tested, adjusted and balanced: 1. Air distribution systems. 2. Air moving equipment. 3. Cooling systems. 4. Heating systems. 5. Domestic hot water recirculating pumps and related balancing valves. 6. HVAC control systems verification to include end devices, control sequences of operation and energy management system control and monitoring point verification.

Post-Bid

Educational

$16,788,360.00

Public - City

New Construction, Site Work

245

28

202

2

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
65
Bidding Soon
3,575
All Active Projects
1,412
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.