Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of an educational facility in Alvarado, Texas. Completed plans call for the construction of a educational facility; and for site work for a educational facility.
**As of October 24, 2024 this project has not yet been awarded. A timeline for award has not yet been established. Back Use of this site is governed by our Terms of Use agreement. If you have any questions please send an email to the administrator. The work included in this Section consists of the furnishing of all labor, instruments, tools and services required in connection with the Testing, Adjusting and Balancing (TAB) of the Heating, Ventilating and Air Conditioning (HVAC) systems as described in the mechanical specifications and shown on the mechanical Drawings, or reasonably implied therefrom, to include the overall commissioning of systems and subsystems such as verification of operation of each control device and all equipment sequences of operation. B. TAB of the HVAC systems will be performed by an impartial Technical Firm who is a member of the Associated Air Balance Council (AABC) and whose operations are limited only to the field of professional TAB work. TAB firm shall be selected by owner and general contractor shall include the allowance noted in the front-end proposal requirements and shall pay the associated TAB firm from this allowance. C. TAB Firm is responsible to and shall submit all reports directly to the Architect/Engineer and Owner. D. TAB services shall result in the optimum temperature, humidity, airflow, pressurization, ventilation rates, and noise levels in the conditioned spaces of the building. E. The following basic components of the HVAC systems shall be tested, adjusted and balanced: 1. Air distribution systems. 2. Air moving equipment. 3. Cooling systems. 4. Heating systems. 5. Domestic hot water recirculating pumps and related balancing valves. 6. HVAC control systems verification to include end devices, control sequences of operation and energy management system control and monitoring point verification.
Post-Bid
Educational
$16,788,360.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 19, 2024
November 18, 2024
1301 S Pkwy Dr, Alvarado, TX
Related To This Project
Alvarado, TX
--
Alvarado, TX
Bid Date: Oct 24 2024
Alvarado, TX
--
Alvarado, TX
Bid Date: Nov 18 2024
Alvarado, TX
Bid Date: Nov 18 2024
Alvarado, TX
Bid Date: Sep 19 2024
Alvarado, TX
--
Alvarado, TX
--
Alvarado, TX
Bid Date: Aug 01 2024
Alvarado, TX
--
Alvarado, TX
--
Alvarado, TX
Bid Date: Jun 05 2024
Alvarado, TX
Bid Date: Jun 05 2024
Alvarado, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.