BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Roanoke, Virginia. Contact the soliciting agency for additional information.

The Authority aims to create a forward-looking and comprehensive strategy to manage improvements to our sewer system over future years. As a growing regional utility, the Authority aims to ensure that the sanitary collection system not only complies with local, state, and federal regulations, but also has the capacity to support the projected growth and the region's economic development, community growth and sustainability objectives for the future. Therefore, it is important for the Authority to accurately assess the current collection system's performance, to predict future sewer infrastructure needs and to allocate capital investment for planned system rehabilitation and replacement, system expansion, effective operation and maintenance measures to extend existing asset life and treatment facility upgrades. Last Day for Inquires: August 16, 2024 Response to all questions published by 5 pm EST, August 19, 2024 The Firm shall provide a statement of qualifications and a specific proposal to furnish all services as required in order to prepare a comprehensive SMP including the work described in this scope of service. The Firm shall research and collect all relevant data necessary to complete the SMP. The Firm is encouraged to propose modifications to the individual tasks listed below if the Firm can demonstrate innovative, advanced, and well thought-out methodologies that are not specifically identified in the task. These proposed additional modifications shall be identified as optional items. The Firm shall carefully control costs and resources, and complete assigned work on schedule. The Firm shall assign a project manager who will act as the Authority's primary contact and will be entirely responsible for the Firm's work and sub-consultant work, if applicable. To ensure the project remains on track, the Firm shall provide a monthly progress report and updated schedule which shall include a brief status of completed work, work anticipated to be completed in the next reporting period, and problems/obstacles identified during the reporting period. Award Notice sent to selected Firm September 16, 2024 Effective contract start date (tentative) October 11, 2024 October 21 ,2024 Kickoff meeting (tentative) October 21, 2024 The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
10
Bidding Soon
365
All Active Projects
147
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2024

img_map_placeholder

Multiple Locations, Roanoke, VA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.