BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Hernando, Mississippi. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.

SECTION 904 - NOTICE TO BIDDERS NO. 9002 The work shall consist essentially of the following items: Removal and replacement of an existing bridge located on Getwell Road. Other improvements include associated earthwork, stone base, and asphalt paving. All other related items of work required to complete the project are as shown and specified in the Contract Documents. The above general outline of features of the work does not in any way limit the responsibility of the contractor to perform all work and furnish all plant, labor, equipment and materials required by the specifications and the drawings referred to therein. All bids must comply with the specifications provided. DeSoto County reserves the right to amend the specifications, as necessary, and agrees to notify all having requested bid packets from the DeSoto County Office of Procurement. Any questions that bidders might have should be directed to Waggoner Engineering, Inc., (662) 429-2100 to the attention of Mitchell Ward or mitchell.ward@waggonereng.com Each bid shall be accompanied by a Cashier's Check, Certified Check on a solvent bank or a Bidder's Bond issued by a Surety Company licensed to operate in the State of Mississippi, in the amount of five percent (5%) of the total bid price, payable to DeSoto County as bid security. Electronic submissions will require the bidder to include an electronic copy of their Certified Check or Bid Bond but a hard copy must be furnished to the DeSoto County Office of Procurement upon bid award. Bidders shall also submit a current financial statement, if requested by the County. The successful bidder will be required to furnish a Performance Bond and a Payment Bond each in the amount of one hundred percent (100%) of the contract amount. The attention of Bidders is directed to the provisions of Subsection 102.07 pertaining to irregular proposals and rejection of bids.

Post-Bid

Bridges / Tunnels

$1,000,000.00

Public - County

Paving, Site Work

22

6

4

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
26
Bidding Soon
377
All Active Projects
157
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2024

October 29, 2024

img_map_placeholder

Getwell Rd, Hernando, MS


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.