Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 9, 2026 at 7:00 PM

Updated November 16, 2026

Renovation of a transportation facility in Dallas, Texas. Working plans call for the renovation of a 4,000-square-foot transportation facility.

https://dallasexpress.com/city/dfw-airport-hits-major-terminal-f-milestone-as-4-billion-expansion-takes-shape/ DFW Airport Hits Major Terminal F Milestone As $4 Billion Expansion Takes Shape Dallas Express | Nov 4, 2026 Share On DFW Airport Terminal F Skylink Station Hits Major Milestone | Video screenshot image of Terminal F Skylink Station construction | Video by DFW International Airport 11/03/26/press release Dallas Fort Worth International Airport has installed six massive, prefabricated sections of the future Terminal F Skylink station, advancing a $4 billion terminal project as other improvements across the airfield begin serving travelers. Airport officials announced the milestone on November 3. Crews lifted the modules into position along the existing Skylink guideway, where workers will connect them to create a station serving the airport’s sixth terminal. The latest work comes after DFW opened new gates at Terminal A and completed a third end-around taxiway in October. The projects address different parts of the same challenge: accommodating more passengers without creating additional bottlenecks between aircraft, gates, and connecting flights. Six Heavy Lifts For A New Skylink Connection The station modules weighed between 210 and 310 tons each. DFW compared the heaviest structure with a fully loaded Boeing 777. A crawler crane arrived in approximately 60 truckloads, and crews spent nearly two weeks assembling it before the lifts. Crews assembled each module at ground level and then lifted it overnight. Each lift took approximately eight hours, an approach the airport says reduced disruptions to the active Skylink system. Workers still must structurally connect and integrate the six sections; passengers cannot use the new station yet. DFW expects to open Terminal F’s first 15 gates in 2027. The completed expansion calls for 31 gates, all serving American Airlines, plus facilities for additional international operations, widebody aircraft, check-in, security screening, baggage handling, and parking. Plans also call for a walking connection to Terminal D. How The $1.6 Billion Plan Grew To $4 Billion When DFW began Terminal F construction in November 2024, officials envisioned a $1.6 billion program with 15 gates. DFW and American Airlines expanded the plan in May 2025, more than doubling the projected gate count and adding dedicated passenger-processing facilities. The Dallas Express covered that expansion in May 2025 and later documented the movement of six enormous, prefabricated structures that formed the first phase of the terminal building in August. The six structures from that earlier milestone differ from the six station modules installed this week. New Gates And A Taxiway Offer Earlier Benefits DFW and American Airlines announced on October 21 that flights had begun using Terminal A gates A10, A11, A13, and A15 the previous week. Those four gates represent the first of 10 planned for a 140,000-square-foot pier expansion. The airport expects the rest of the project to open for the winter holiday travel season. On October 27, the airport confirmed completion of its Southwest End-Around Taxiway, its third such route. These taxiways let aircraft move around active runways instead of crossing them. DFW says they reduce taxi time by an average of four minutes per flight on the routes they serve. That figure does not mean every flight saves four minutes. Together, the new gates and taxiway show that parts of DFW’s construction program already affect daily operations even as work on Terminal F continues. Passenger Growth Raises The Stakes The terminal program sits within DFW Forward, the airport’s approximately $12 billion capital plan for terminal, airfield, and roadway improvements. In a fiscal planning document, DFW forecast 101 million passengers for fiscal 2029 and 105 million for fiscal 2030, compared with a budgeted 87.4 million in fiscal 2026. The projections are estimates, not actual passenger counts. For travelers, the airport’s next major test will be whether the new Skylink station, expanded gates, and ground operations come together on schedule. For now, the new station’s modules are in place, while Terminal F’s first gates remain targeted for 2027. ------------------------------------------- https://communityimpact.com/grapevine-colleyville-southlake/transportation/7-construction-updates-from-dallas-fort-worth-international-airport/ The Dallas Fort Worth International Airport Board approved construction projects on Terminals A, C, D, E and F and road work near the Rental Car Center during the Aug. 6 meeting. The projects are part of the DFW Forward capital plan, according to the airport website. Terminal A A reimbursement agreement with American Airlines was approved for $6.5 million for construction of the Terminal A pier ramp space, part of the Central Terminal Area expansion. 481495 Carson Hearing Care-GCS-08-2026-Website Leaderboard According to board documents, the work will include interior reconstruction for offices, ramp-level restrooms, a breakroom and renumbering the north part of Terminal as the north Skylink station. A filing with the Texas Department of Licensing and Regulation shows the project will encompass 51,000 square feet and has an estimated completion date of Dec. 31, 2028. Terminal C More than $940 million was approved on two projects within Terminal C. Priority Signs & Graphics Work on Terminal C by Suffolk-3i, a joint venture between Suffolk Construction and 3i Contracting, will be extended by 975 calendar days to Dec. 31, 2029. Phase 1 of the Terminal C is complete and this contract for $832.2 million covers the remaining scope of the renovation, according to board documents. The contractor will handle the demolition of the top two levels, followed by the construction of a new structure that will include steel, building envelope, curtain walls and main HVAC systems. In addition, American Airlines will concurrently perform the interior finish-out for mechanical, electrical, plumbing, security, data, technology and other terminal operations support. In addition, there will be the installation of the south Skylink Station canopy at the new baggage-handling system and the DFW Art Program's structure support systems and lighting. 479812 CCMC-GCS-08-2026-Website Leaderboard That contract is for $91.7 million, according to board documents. Terminals D and E Vanderlande Industries, Inc., from Marietta, Georgia, will provide operations and maintenance service for Terminal E and a baggage handling control room operation for Terminal D. The 5-year contract has a start date of October and is for an amount not to exceed $66.8 million, according to board documents. 452805 Tarrant Area 911-KRN-GCS-08-2026-Website Leaderboard Terminal F A nearly $300 million reimbursement agreement was approved with American Airlines for the Terminal F baggage handling system for the newest terminal that is set to open in 2027. The Fort Worth-based airline procured the equipment to support the inbound, outbound and early bag storage system. A supplemental funding request for the connection to the Terminal F head house and connecting building will be coming at a later date, according to the board documents. Phase 2 of the ticketing, processing, garage and roadways was approved for $73.5 million, which has a 487 calendar-day term with Uplift Partners of Richardson. That total includes $6.6 million for change orders on an as-needed basis. 452805 Tarrant Area 911-KRN-GCS-08-2026-Website Leaderboard This contract is for the design and construction of the infrastructure that will be located in the median of International Parkway for customer ticketing, processing, baggage drop-off and baggage claim areas, according to board documents. The parking garage will feature 5,200 spaces with a dedicated pedestrian bridge connecting to the security checkpoint and gates. According to board documents, customers will initially use Terminal D for these services until the new facility is completed. Rental Car Center Coventry & Gattis Air Conditioning A more than $9 million contract was awarded to Archer Western Construction LLC of Irving for Rental Car Center bus roads and bridge rehabilitation. The project has a 455 calendar-day term with an estimated completion in late October 2027. The roadways and bridges around the Rental Car Center were constructed in 2000. The work will include phased work for concrete pavement, bridges, stormwater drains, retaining walls and related infrastructure, according to board documents. ----------------------------------------- https://www.bizjournals.com/dallas/news/2026/07/27/stillwater-capital-mansfield-new-project-canals.html Mansfield considers 153-acre mixed-use district with canal system Amazon distribution center in Terrell moves closer to approval A mixed-use district around a canal system is being floated in Mansfield. A hotel and three other properties could be acquired by DFW Airport. A developer is requesting a break on impact fees for a restaurant and entertainment district in Anna. Amazon's distribution network in North Texas continues to grow. And a bank in the massive Fields development in Frisco is moving ahead. ____________________________________________________________________________________________________________________________________________ https://simpleflying.com/massive-us-airport-expansion-projects-reshape-america-flies/ The DFW Forward project at Dallas-Fort Worth Airport (DFW) is another Mega project with an estimated budget of around $12 billion. The program encompasses massive terminal area expansion, as the airport is completely rebuilding 83 gates across terminals A and C, as well as building an all-new 31-gate international facility at Terminal F. The enormous undertaking comes as DFW expects to accommodate over 100 million passengers per year going forward. DFW set the World Cup as a deadline for the modernization of Terminal C, the International Parkway, and new rental car facilities. As the soccer fans depart, work will continue on Terminal F and additional construction on Terminal C. Meanwhile, Houston's George Bush Intercontinental Airport (IAH) completed its $1.46 billion international terminal redevelopment program just in time to add a new D West pier and 17-lane security gate before the FIFA matches started. Houston opened terminals B, D & E in 2024, including the new 160,000-square-foot D West Pier. The new area included widebody-capable gates as well as a decorative 380-foot-tall LED wall. IAH still has over $2.6 billion worth of transformative work to complete on Terminal B and retail expansions after the World Cup concludes. --------------------------------- As of February 12, 2026, this project is in design. The architect and general contractor have been identified. A firm construction timeline has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Pre-Construction/Negotiated

Transportation Terminals

$14,000,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
426
Active Projects
146
Bidding Soon
4,539
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2026

Project location map

2400 Aviation Dr, Dallas, TX

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed