BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Titusville, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Sidewalk Removal and Replacement Project at North Brown, North Kerr, and North Martin Streets for the City of Titusville The Work Which the Contractor is Required to Perform Under This Contract Shall Be Commenced at the Time Stipulated by the Owner in the Notice to Proceed to the Contractor and Shall Be Fully/finally Completed by November 27, 2024. Each Proposal Must Be Accompanied by a Certified Check or Bid Bonding the Amount of 10% of the Contract Amount, Made Out to the City of Titusville, as a Guarantee That the Bidder Will Furnish Proper Bonds Satisfactory to the City, and Enter Into a Contract to Do the Said Work. This Check or Bond Will Be Forfeited to the City of Titusville in Case of Failure to Do Said Work. The Successful Bidder Will Be Required to Furnish the City of Titusville With a Labor & Material Bond of 100%, a Performance Bond of 100%, and Proof of Insurance. The City of Titusville Reserves the Right to Reject Any or All Proposals or Waive Any Informality Therein and Award the Contract to the Best Interests of the City. No Bid May Be Withdrawn for a Period of Sixty (60) Days From the Opening Date. Bidders Must Submit With Their Bids Their Completed Non-collusion Affidavit and Any Other Signature Documents Contained in the Contract Documents. All Bidders Are Herein Notified That Minority Business Enterprises (Mbes) and Women Business Enterprises (Wbes) Will Be Afforded Full Opportunity to Submit Bids in Response to This Notice and Will Not Be Subjected to Discrimination on the Basis of Race, Color, Sex or National Origin Inconsideration for Award of the Contract. In Addition to the Equal Employment Opportunity Requirements of Executive Order 11246 Regarding Discrimination, the Contractor Must Establish a 3% Goal for Wbe Participation and a 5% Goal for Mbe Participation in Aggregate on-site Construction Work Force for Contracts in Excess of $10,000. Attention is Called to the Fact That Not Less Than the Minimum Salaries and Wages as Established by the Us Department of Labor (Davis Bacon) Must Be Paid on All Projects, and the Contractor Must Ensure That Employees and Applicants for Employment Are Not Discriminated Against Because of Their Race, Creed, Color or National Origin.

Post-Bid

Sidewalks / Parking Lot

$400,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
26
Bidding Soon
405
All Active Projects
186
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2024

October 16, 2024

img_map_placeholder

Multiple Locations, Titusville, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.