Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 23, 2025 at 7:00 PM
Updated December 24, 2025
Site work and paving for a sidewalk / parking lot in Dallas, Oregon. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Region 2 PE EA PE003386 CON EA CON04834 The purpose of this project is to construct curb ramps to meet compliance with the Americans with Disabilities Act (ADA) standards. This project includes design and related construction services associated with upgrading curb ramps at signalized and non-signalized intersections; as well as mid-block crossings on and adjacent to ODOT Right-of-way (ROW). Or223/or99w Curb Ramps Project in Dallas and Rickreall. Fap No. Sa00(486). Estimated Value : ($ 2,000,000 - $ 5,000,000). Req. Approx.1,300 Ft2 Temp Sign; 4 Ea Seq Arr; 1,600 Hr Flag; 3 Ea Flag Light Sta; 280 Ea Tcs; 1,200 Ft Temp Tape; 130 Ft Stripe Rem; 2,042 Bar Rem; 750 Ft Pcd; 140 Ea Temp Curb Ramp; 37 Ea Inlet Protect; 57 Ton Cont Soil Disp; 5 Ea Soil Test; Const Surv Work; 3,100 Yd2 Rem Surf for Curb Ramp; 3,300 Ft Asph Sawcut; 35 Ea Adj Inlet/box; 5 Ea Adj Manhole; 350 Yd2 Cppr; 1,600 Ton Aggr Base; 500 Ton Acp; 700 Ft2 Asph Sl Pave; 6,600 Ft2 Pvmt Rep; 4,250 Ft Conc Curb; 17,400 Ft2 Conc Walk; 121 Ea Curb Ramp; 1,400 Ft2 Trunc Dome; 2,039 Ft2 Pvmt Bar; 1 Ea Crosswalk Close Supp; 257 Fbm Wood Sign Supp; 1,313 Lb Sign Supp; 4 Ea Traff Sig Mod; 0.5 Acre Perm. Seed; 75 Yd3 Soil; 40 Yd3 Bark Mulch; 2,000 Ft2 Weed Cont. Geot.. Completion Time: March 13, 2026. Class of Work: Miscellaneous Highway Appurtenances This Project Contains Fuel Escalation Clause. This Project Contains a 10% Dbe Goal. The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. For Bids submitted by hand delivery, date stamp the Bid with the provided date stamping device and place into the ODOT Procurement Bid Box located in the 1st floor lobby at the following address: Oregon Department of Transportation 355 Capitol Street NE, Salem, Oregon 97301 OR DOT - 004 - OR223/OR99W Curb Ramps Project in Dallas and Rickreall *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Work will include: removal of existing concrete panels in locations with non-compliant ramps. This typically requires excavation to approximately 18 inches beneath the existing ramp and adjacent sidewalk. A ramp and landing area that meets ADA compliance will then be constructed in this location. In many locations, there are also inlets that will be slightly moved to prevent ponding or obstruction of access to the newly constructed ramp. This will also require slight excavation to attach the new inlet to the storm sewer system. If the proposed ramp replacement is at a signalized intersection or RRFB controlled mid block crossing, then an upgrade or relocation of the pedestrian push button may be needed. This will likely require shallow excavation to connect to the existing electrical conduit. In locations approved for crosswalk closures, work typically involves the placement of barrier. This has little to no ground disturbance. All of the actions outlined in this paragraph are include in the API/ APEthat has been developed for this project. MBE (2.9%), WBE (6.9%), DBE (10%) construction will be completed around 02/27/2026. It is assumed that construction will begin on 06/13/2025.
Award
Sidewalks / Parking Lot
$1,869,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 17, 2025
June 13, 2025
OR-223, Dallas, OR
Related To This Project
Dallas, OR
--
Dallas, OR
Bid Date: Jan 02 2025
Dallas, OR
Bid Date: Dec 19 2024
Dallas, OR
--
Dallas, OR
Bid Date: Feb 13 2025
Dallas, OR
Bid Date: Aug 15 2024
Dallas, OR
--
Dallas, OR
--
Dallas, OR
--
Dallas, OR
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
