BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2024 at 8:00 PM

Updated September 20, 2024

Site work and paving for a civil project in St Eustache, Manitoba. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

* Award subject to final approval. Intersection Improvements including turning radius grade widening, drainage improvements (metal culvert) and granular base course at PR 427/PR 334 for a total construction distance of approximately 100 meters in the Municipality of Headingley. Completion Model the Contract Will Be Assessed Liquidated Damages in Accordance With the Specification for Liquidated Damages - Completion Specified by Completion Date. Liquidated Damages the Work Must Be Completed by No Later Than November 15, 2024. Daily Liquidated Damages After This Specified Completion Date Will Be Charged to the Contractor at the Rate of Five Hundred ($500.00) Dollars Per Calendar Day Until the Work is Completed. Seasonal Shutdown Date the Seasonal Shutdown Date for This Project is: October 31 of Every Calendar Year. Question Acceptance Deadline: 2024/09/09 12:00:00 PM CDT Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Roads / Highways

$349,490.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
40
Bidding Soon
552
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2024

October 14, 2024

Project location map

MB-334 & MB-427, St Eustache, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.