BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 29, 2025 at 8:00 PM

Updated April 30, 2025

Site work and paving for a road / highway in Milwaukee, Wisconsin. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

I-94 East West, W Allis-chalmers Dr CONST/New Roadway 1200-ft E of 70th St to 60th St Length : 0.028 Route : Loc Str County - Milwaukee Estimate Anticipated Funding $8,000,000 - $8,999,999 As of April 29, 2025, the project is in Conceptual status. Anticipated letting date is 03/14/2028. WisDOT - I-94 East West, W Allis-Chalmers Dr *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. __________________________________________________________________________________________________________________________________________ https://finance-commerce.com/2024/08/milwaukee-groups-sue-to-stop-i-94-expansion-project/ Milwaukee groups sue to stop I-94 expansion project Four environmental and community groups on Monday filed a federal lawsuit to stop Interstate 94 from expanding in Milwaukee. ____________________________ I-94 East West, W Allis-chalmers Dr CONST/New Roadway 1200-ft E of 70th St to 60th St County - Milwaukee Estimate Anticipated Funding $8,000,000 - $8,999,999 As of August 29, 2024, the project is in Conceptual status. Anticipated letting date is 03/14/2028 . WisDOT - I-94 East West, W Allis-Chalmers Dr *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Roads / Highways

$8,999,999.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
399
Active Projects
157
Bidding Soon
2,635
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2028

Project location map

I-94, Milwaukee, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.