BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2025 at 7:00 PM

Updated February 5, 2025

Site work for a playground / park / athletic field in Brooks, Georgia. Completed plans call for site work for a playground / park / athletic field.

Brooks Baseball Fields #1 and #3 Fencing - Install backstop 20'tall with a 5-foot overhang running from dugoutto dugout with an extra retaining bar 12 inches from bottom rail. there will be the normal middle rail installed also. overhang welding of post shall be allowed. contractor will be responsible for measuring the field for exact distances. FABRIC: All fabric 20' tall and the 5' overhang shall be 9-gauge core extruded bonded. (2" mesh) black, installed knuckles up. Fabric shall be stretched taut using a stretching bar. TOP RAIL: 1 5/8-inch O.D. Black Master Color 'LCX' LG-40 pipe. 21 ' lengths, joined with 1 5/8-inch sleeve where applicable. MIDDLE RAIL: Shall be attached to the entire length of the back stop. An extra middle rail retaining bar shall be placed 24" from the bottom rail on the back section directly behind the catcher. BOTTOM RAIL: Shall be attached to the entire length of the back stop. An extra bottom rail retaining bar shall be place 12" from the bottom rail. LINE POST: Set 10' on center maximum spacing if applicable and line posts shall be 2 1\2" O.D. Black Master Color LCX LG-40 pipe. ALTERNATE BID: Paint backstop vertical terminal post on field #1 instead of replacing the post. Metal Roof: 26 gage Multi Rib Metal Roof (Black Color) o Metal Roof to Overhang 2" all sides o All dugout roof rails shall be spaced 36' apart. Roof rails shall be black to match backstop. o Black Fence Fabric on side and back. Open dugout entrances shall remain where they are currently located on field #1. Open dugout entrances shall be located on outfield side of dugout on field #3. o All vertical supports 2 7/8" in black to match backstop. o All rails 1 5/8" in black to match backstop. o 1 1/2" rigid pipe clamps in black to match backstop. o All end rail cups, brace bands, end rail clamps and hardware shall be black to match backstop. o Contractor shall coordinate with Fayette County on needed concrete work on backside of 1st base dugout. o See Attachment A for an example of a dugout drawing. Dugout heights and lengths shall remain as they are currently. Questions concerning this invitation to bid should be addressed to Michelle Sampson in writing via email to msampson@fayettecountyga.gov or fax to (770) 719-5544. Questions will be accepted until 2:00 (pm), Friday, September 13, 2024. ALL WORK MUST BE COMPLETED BETWEEN NOVEMBER 15, 2024, AND FEBRUARY 1,2025. Bid Results :: FIELD #1 :: Hasbun Construction LLC :: $68,000.00 FIELD #3 :: Hasbun Construction LLC :: $51,235.00

Award

Playgrounds / Parks / Athletic Fields

$122,485.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
299
Active Projects
185
Bidding Soon
2,351
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2024

November 15, 2024

Project location map

To Be Determined, Brooks, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.