Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a transportation facility in Fort Scott, Kansas. Conceptual plans call for site work for a transportation facility.
The City of Fort Scott (Sponsor) is hereby soliciting Statement of Qualifications from consultants for airfield development projects that are anticipated to occur within the next five years at the Fort Scott Municipal Airport (LOC KFSK) located in Fort Scott, KS. Subject to receipt of Federal funding, these projects may include the following: Reconstruct Runway Lighting and NAVAIDs. Estimated Construction Cost $700,000 Reconstruct Taxiway Lighting. Estimated Construction Cost $690,000 Runway/Taxiway Grading. Estimated Construction Cost $480,000 Seal Apron Pavement Surface/Repair Joints. Estimated Construction Cost $250,000 Reconstruct Taxi lane. Estimated Construction Cost $370,000 Obstruction Marking/Lighting/Removal. Estimated Construction Runway $45,000 Obstruction Marking/Lighting/Removal. Estimated Construction Taxiway $45,000 Miscellaneous Pavement Maintenance and Rehabilitation (Cost Unknown) Miscellaneous Hangar Development (Cost Unknown) hese projects have been developed from the Sponsor's Airport Capital Improvement Plan (CIP) prepared with assistance from Olsson Engineering. A copy of each project CIP Data Sheet will be made available upon request. The services to be provided may include, but are not limited to, preliminary design, final design, bidding, construction observation, and incidental special services such as geotechnical/subsurface investigations and topographic surveying. A qualification-based selection process conforming to FAA Advisory Circular 150/5100-14E Architectural, Engineering, and Planning Consultant Services for Airport Grant Projects will be utilized to select a consultant. Fee information will not be considered in the selection process and shall not be submitted with the Statement. Fees will be negotiated for projects as federal funds become available. The agreement(s) between the Sponsor and the selected consultant will be subject to all applicable Federal Rules and Regulations as identified in AC 150/5100-14E. Consultants will be rated by a selection committee according to the following selection criteria and the weight given to each: Capability to perform all aspects of the projects (20%) - qualifications of prime firm (and sub-consultants, if any). Relevant experience of key personnel from prime firm (and sub-consultants, if any) and role. Knowledge of FAA standards, policies, and procedures (20%). Recent experience with comparable projects at similarly sized airports (20%). History of meeting schedules and staying withing budget (20%). The Sponsor reserves the right to reject any and/or all Statements. Submissions will become property of the Sponsor. The method of Contractor Selection has not been Determined at this time
Conceptual
Transportation Terminals
$2,580,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 22, 2025
932 187th Terrace, Fort Scott, KS
Related To This Project
Fort Scott, KS
Bid Date: Oct 16 2024
Fort Scott, KS
Bid Date: Sep 23 2024
Fort Scott, KS
Bid Date: Sep 18 2024
Fort Scott, KS
Bid Date: Aug 21 2024
Fort Scott, KS
--
Fort Scott, KS
--
Fort Scott, KS
--
Fort Scott, KS
Bid Date: Jul 01 2024
Fort Scott, KS
Bid Date: Jun 17 2024
Fort Scott, KS
Bid Date: Jul 18 2024
Fort Scott, KS
Bid Date: Jun 12 2024
Fort Scott, KS
Bid Date: Jun 13 2024
Fort Scott, KS
Bid Date: May 22 2024
Fort Scott, KS
Bid Date: May 22 2024
Fort Scott, KS
Bid Date: Apr 01 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.