BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Elmore, Vermont. Completed plans call for site work for a bridge / tunnel.

Elmore Bf 0241(55) - Vt Route 12, Bridge 94, Approximately 5.6 Miles South of the Junction With Vt Route 15a, in the Town of Elmore. Elmore Stp Culv(64) - Vt Route 12, Bridge 90, Approximately 11.0 Miles South of the Junction With Vt Route 15a, in the Town of Elmore. Worcester Bf 0241(56) - Vt Route 12, Bridge 87 Over Hardwood Brook, Approximately 4.5 Miles North of the Junction With Calais Road in the Town of Worcester. Worcester Bf 0241(57) - Vt Route 12, Bridge 89, Approximately 5.3 Miles North of the Junction With Calais Road in the Town of Worcester Type of Construction: Elmore Bf 0241(55) - Existing Culvert Replacement With a Four-sided Precast Concrete Box Culvert With Associated Roadway Improvements. Elmore Stp Culv(64) - Existing Culvert Replacement With Steel Girder Bridge With Associated Roadway Improvements. Worcester Bf 0241(56) - Existing Culvert Replacement With a Four-sided Precast Concrete Box Culvert With Associated Roadway Improvements. Worcester Bf 0241(57) - Existing Culvert Replacement With Steel Girder Bridge With Associated Roadway Improvements This Contract shall be completed on or before October 23, 2026 For this proposal the Engineer's Estimate is Category G 10,000,000 - $25,000,000 Questions: During the Advertisement Period, All Questions Shall Be Addressed Solely to the Office of Contract Administration via Email: Aot.constructioncontractinginquiry@vermont.gov. All Inquiries Must Be Received by 4:30pm on Wednesday, September 18, 2024. Prequalification of Contractors: All Bidders on This Project Must Hold Both Current Annual Prequalification With the Vermont Agency of Transportation Through the "Contractor's Experience Questionnaire and Financial Statement" And Unconditioned Project-specific Approval Through the "Standard Form - Request for Proposal" Ca-82 Form The estimates of quantities are not guaranteed, but are given as a basis for the comparison of bids. The right is reserved to reject any or all bids, to waive any formality, and any and all technicalities in bids, and to accept such bids as may be deemed in the best interest of the awarding agency VTDOT: Elmore BF 0241(55) & Elmore STP CULV(64) & Worcester BF 0241(56) & Worcester BF 0241(57)

Award

Bridges / Tunnels

$13,463,015.00

Public - State/Provincial

Site Work

36

6

25

8

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
81
Bidding Soon
1,409
All Active Projects
574
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2024

December 10, 2024

img_map_placeholder

VT-12, Elmore, VT

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.