BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Fairfield, Connecticut. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Town of Fairfield (Town) on behalf of its Department of Public Works (DPW) and Economic Development is seeking competitive bids from qualified Contractors to provide all labor, materials, equipment, and all else necessary for the Southport Community Connectivity Project as per the drawings and project specifications prepared by BL Companies. The goal of this project is to alleviate periodic congestion, improve roadway safety, improve pedestrian access and safety, support future development and enhance the visual appearance of this busy commercial corridor and key gateway into Town. NOTE: This project is being partially funded by a Community Connectivity Grant administered by the Connecticut Department of Transportation (CTDOT) and Office of Policy Management (OPM). The Town anticipates a project start date in November 2024 with a 6-month timeline for the completion of this project. The Contractor will be expected to provide their anticipated schedule upon award of the contract. Written requests for information will not be accepted after 4:30pm on Friday, 20th September 2024. Questions concerning this bid must be submitted in writing and directed only to: Ms. Lee A. Flaherty, Assistant Director LFlaherty@fairfieldct.org. A five (5) percent bid bond or equal approved security as stated per the Terms and Conditions must be submitted with the proposal. All bonds, including payment and performance bonds when applicable, shall be written by a surety company or companies licensed to issue bonds in the State of Connecticut, and shall have at least an A-VII policy holders rating, as reported by A.M. Best Rating Services, or otherwise deemed acceptable by the Town. The Town always reserves the right to reject surety companies, if an approved surety bond cannot be provided the bidder shall be deemed non-responsive. The successful bidder, within seven (7) business days after notification of award, will be required to furnish Performance and Labor and Material Bond provided by a company authorized to issue such bonds in the State of Connecticut, or Certified Check or properly executed Irrevocable Letter of Credit equal to a hundred per cent (100%) of the award.

GC Bidding

Roads / Highways

$700,000.00

Public - City

Paving, Site Work

60

7

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
799
Active Projects
470
Bidding Soon
6,716
All Active Projects
2,744
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 2, 2024

November 1, 2024

May 1, 2025

img_map_placeholder

Multiple Locations, Fairfield, CT


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.