BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 18, 2024 at 8:00 PM

Updated September 4, 2025

Site work and paving for a road / highway in Leander, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

To provide construction services for the delivery of the of San Gabriel Parkway Phase 2. The Work consists of extending San Gabriel Parkway by approximately 2,200 feet eastward, from the existing section in Palmera Bluff to Ronald W. Reagan Boulevard. The four-lane, divided roadway will require tree removal, grading, paving, and the installation of a stormwater drainage system. Only the south two lanes will be constructed at this phase. Question Deadline 10/01/2024 at 5:00 PM CT

Post-Bid

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

217

12

14

10

Subscribe For Documents

95 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
127
Bidding Soon
2,414
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2024

November 18, 2024

Project location map

San Gabriel Pkwy, Leander, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.