BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 8, 2025 at 7:00 PM

Updated January 9, 2025

Demolition, site work and renovation of a civil project in Ardmore, Alabama. Completed plans call for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

The major scope of work items include: Construction of a new headworks, sequencing batch reactor and post equalization basin, disk filtration, ultra violet disinfection, post aeration, and motor control center, modifications to the existing influent pumping station, demolition of existing tankage, and all associated electrical, piping/valve, and pump work for a complete and operational system. Bid submission details : Envelopes containing bids must be sealed, marked, addressed as follows, and delivered to the Board Chairman, The Water Works and Sewer Board of the Town of Ardmore, Alabama, 26772 Main Street, Ardmore, AL 35739: "Bid for Constructing Ardmore Wastewater Treatment Plant Renovations (Project No. 1195001)," to be opened. The Bidder's Alabama State General Contractor's License Number shall be included on the envelope containing the submitted proposal. It is the intent of this project to make improvements /upgrades to the Ardmore Wastewater Treatment Plant. The work includes the following: 1. Obtain all permits, bonds, and licenses necessary to perform the work including City Business license and necessary City permits. This is a subsidiary obligation of the various contract bid items. 2. Prospective bidders are encouraged to attend the pre-bid meeting as indicated in the Invitation for Bids and Instruction to Bidders. 3. The Contractor shall satisfy himself prior to bidding on the project that he has viewed the project site and performed any necessary inspection of the structures and site layout/grading in order to fully determine the work to be performed. The site will be open for inspection during and following the prebid meeting. All requests for additional viewing times shall be coordinated with Wayne Miller, Supervisor, at 256-431-7708 prior to visiting the site. 4. Install, maintain, and remove erosion control, as necessary. The Contractor shall develop an erosion control plan and provide the plan in a submittal. This is a subsidiary obligation of the unit prices bid. 5. Install necessary signage to warn the public of the utility work. 6. Coordinate with the SCADA system integrator to have the SCADA system installed, tested and operational at the appropriate times. 7. Perform the necessary work for the upgrades for a complete and operational system including coordinating all field inspection and testing with equipment manufacturers. 8. The existing Wastewater Treatment plant is a fully operational facility and will remain in operation throughout construction. The Contractor shall coordinate work closely with the treatment plant staff and not interfere with the daily operations and maintenance of the facility. 9. Complete restoration of disturbed areas. All disturbed areas shall be restored to their original condition or as noted on the plans.

Bid Results

Water / Sewer

$15,773,000.00

Public - City

Demolition, Renovation, Site Work

134

27

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
0
Bidding Soon
537
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2024

November 4, 2024

Project location map

29529 Jones Ave, Ardmore, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.