BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a power facility in Lincoln, Nebraska. Completed plans call for site work for a power facility.

The intent of this specification is to set out minimum requirements for the construction, retirement and installation of electric transmission facilities that meet the construction standards of Lincoln Electric System (LES). This specification covers the retirement, construction, assembly, and installation of the poles, insulators, conductor, shield wires, and other hardware items of the LES transmission project(s) included in this contract. It shall be the responsibility of the contractor to review the drawings and visit the construction site to determine any adverse conditions and to take into consideration all details of the construction which are not covered in this specification. All lines to be constructed with self-supported galvanized steel monopoles. Phase conductors are a combination of bundled 397.5 26/7 T2 (Ibis), bundled 954 45/7 Rail, and single 954 45/7 Rail. Shield wires are a combination of OPGW and 7#8 Alumoweld. Phase conductors will be supported by polymer suspension insulators, braced post insulators, and glass deadend insulators. All transmission corridors will be acquired and cleared of vegetation prior to construction. All work is expected to fall within the Completion Schedule provided in writing by LES. 345kV L1485 - WO: 5039136: Install new transmission line consisting of 1.1 miles of 345kV construction, 0.5 miles of which is double circuit with 115kV L1315. Retire approximately 0.7 miles of 345kV transmission line south of the new 56th & Bluff Substation which is double circuit with a 115kV line. Six steel double circuit tangent structures will be removed. To the extent practical, the existing line shall be left in place until the new line is nearing completion in case it needs to be reenergized in short notice. 115kV L1315 - WO: 5039137: Install new transmission line consisting of 0.7 miles of 115kV construction, 0.5 miles of which is double circuit with 345kV L1485. 115kV L1369A - WO: 5039137: Install new 115kV transmission line consisting of approximately 0.6 miles of 115kV construction. 115kV L1375 - WO: 5039137: Install new 115kV transmission line consisting of approximately 3.3 miles of 115kV construction. L13C104 T/C/D, L13C106 T/C/D - WO: 5039147: Install new 115kV transmission lines consisting of 0.6 miles of new single circuit 115kV construction. West Perun substation may not be ready for the final spans as part of this project. Overall Construction Window: January 3, 2025, to October 2, 2026 Question Deadline 09/17/2024 at 4:00 PM CT All questions must be submitted through this ONLINE under the clarifications tab.

GC Bidding

Power Plant

$810,000.00

Public - City

Site Work

38

15

2

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
59
Bidding Soon
827
All Active Projects
353
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 26, 2024

January 3, 2025

October 2, 2026

img_map_placeholder

To Be Determined, Lincoln, NE


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.