BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 15, 2024 at 7:00 PM

Updated November 16, 2024

Demolition, site work, paving and new construction of a mixed-use development in Caldwell, Idaho. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

County: Canyon Description: widening the existing SH-55 corridor between Farmway Rd. and Middleton Rd., including bridge replacements, construction of pedestrian pathways, drainage/irrigation facilities, soundwalls, retaining walls, and traffic signals Please Contact the Resident Engineer *** Andrew Linder P.e.*** at (208) 334-8331 or Andrew.linder@itd.idaho.gov for Any Design-related Questions. IDOT: Call 1- SH-55, Farmway Rd. To Middleton Rd.

Award

Bridges / Tunnels

$96,143,241.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

1496

13

4

8

Subscribe For Documents

67 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
16
Bidding Soon
294
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2024

December 1, 2024

Project location map

ID-55, Caldwell, ID


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.