Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Pelham, Alabama. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.
** As of November 14,2024 , project was awarded to TrailVisions, Inc but awarded amount is not available.** Innovate Alabamas Adventure Expansion into Oak Mountain State Park's Forever Wild Woodlands Trail Project SCOPE OF WORK A. Contractor shall utilize construction practices to minimize erosion and sediment runoff during construction. Installation of all required BMPs shall be the responsibility of the Contractor as outlined in the project notes. B. Work of this section includes the installation of devices to collect or trap silt from leaving the site as required and shall be performed by the Contractor if required. C. Work shall comply with the latest edition of city ordinance and/or regulations and requirements of any governing authorities in clearing and erosion control. D. The intent of these specifications is to ensure that erosion produced by this project is minimized to the maximum extent possible.
Award
Playgrounds / Parks / Athletic Fields
$750,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 26, 2024
December 1, 2024
200 Terrace Dr, Pelham, AL
Related To This Project
Pelham, AL
--
Pelham, AL
--
Pelham, AL
--
Pelham, AL
Bid Date: Nov 07 2024
Pelham, AL
Bid Date: Nov 19 2024
Pelham, AL
--
Pelham, AL
Bid Date: Dec 04 2024
Pelham, AL
Bid Date: Aug 22 2024
Pelham, AL
--
Pelham, AL
--
Pelham, AL
--
Pelham, AL
Bid Date: May 16 2024
Pelham, AL
Bid Date: Apr 25 2024
Pelham, AL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.