BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a residential development in Cherry Valley, Arkansas. Completed plans call for the construction of a 3,286-square-foot residential development.

As of September 25th, 2024 - this project's sole bid was rejected and it may rebid in the future. Cross County Superintendent Residence Bid Proposals Must Be Accompanied by a Bidder's Bond Or cashiers Check in the Amount Offive Percent (5%) of the Bid, Made payable to the Cross County school District, Cherry Valley, arkansas. The Successful Bidder Will Be required to Furnish Satisfactory performance and Payment Bond using Aia Document A312. The Owner Reserves the Right To waive Any Informality, or to Reject Any or All Bids. No Bid Shall Be Withdrawn for A period of Thirty (30) Days Subsequent to the Opening of the Bids, without Written Consent of The owner. The work generally consists of: 1. The construction of a 2,780 sq.ft. residence, including two-car garage with storage and 506 sq.ft. second level - bonus room. Construction shall include plumbing, HVAC, electrical and finishes complete. 1.2 LAYOUT OF NEW WORK A. The General Contractor shall be responsible for correct layout of all proposed improvements in accordance with the Drawings. He shall establish building lines, grades and elevations called for on the Drawings.

Post-Bid

Residential Subdivision

$400,000.00

Public - County

New Construction, Site Work

15

17

4

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
24
Bidding Soon
375
All Active Projects
144
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2024

November 16, 2024

img_map_placeholder

To Be Determined, Cherry Valley, AR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.