BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Normandy Park, Washington. Completed plans call for site work for a water / sewer project; and for paving for a water / sewer project.

Scope: The work scope includes, but is not limited to the following elements: I. Contractor designed work. 2.Installation, testing, and commissioning of Owner Furnished Equipment (total equipment value of $2.2 million). 3.Contractor designed and provided temporary facilities to maintain continuous treatment plant operations. 4.Demolition of existing structures and equipment. 5.Civil sitework, including temporary shoring and excavations, underground utilities, paving and site restoration. 6.Blower Building architectural, structural, and mechanical modifications to accommodate motor control center and engine generator room reconfiguration. 7.Solids Building architectural, structural, and mechanical modifications to accommodate motor control center and laboratory reconfiguration. 8. New electric power and control systems, including replacement of conduits, wiring, switchboards, transfer switches, motor control centers, control panels, and a new engine generator. 9.Controls integration work performed by Quality Controls Corporation. 10. New hot water boilers, hydronic pumps and piping systems, and. digester gas piping systems and appurtenances. I1.Testing and Commissioning. Each bid shall be made out on a bid form contained in the specifications. Bidders and/or Contractors are notified to examine thoroughly the bid instructions, proposals, the form of Contract, Drawings and Specifications. If there is any doubt or uncertainty as to the meaning of same, intending bidders or Contractors should submit questions in writing to the Owner and Engineer for an explanation before submitting their proposal and /or accepting their Contract Each bid shall be accompanied by a Bid Bond, Cashier's Check or Certified Check, made payable to the Owner as indicated in the Instruction for Bidders. The bids may not be withdrawn for 60 days after the day of bid opening. If you have questions, please contact both of the following individuals: Kitty Carter, Project Coordinator (District) - kitty. carter@swssd.com. Cameron Ochiltree, P.E., Project Manager (BHC) - cameron.ochiltree@bhcconsultants.com. Estimated Cost: The estimated cost for this project is $5.3 million (excluding sales tax). Estimated Schedule: The estimated project duration is 12 months after Contractor Notice to Proceed (NTP). The Contractor Notice To Proceed is expected to occur in January 2025 to coordinate with delivery of Owner Furnished Equipment. Doc note: Project Documents: It is recommended that Bidders "Register" to receive automatic e-mail notification offuture addenda and to place themselves on the "Self-Registered Bidders List". Bidders that do not register will not be automatically notified of addenda and will need to periodically check the on-line online for addenda issued on this project. online. The content available through online is our property or the: property of our licensors and is protected by copyright and other intellectual property laws. Access to project documents is intended for use by bidders (general contractors/prime bidders, subcontractors and suppliers), agency personnel and agency's consultants, as well as for personal, non commercial, use by the public. You may display or print the content available for these uses only. "Harvesting" (downloading, copying, and transmitting) of any project information and/or project documents for purposes of reselling and/or redistributing information by any other party is not allowed by online. The Owner reserves the right to reject any and all bids or waive any informalities in. the bidding.

Post-Bid

Water / Sewer

$5,300,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
48
Bidding Soon
866
All Active Projects
322
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

January 1, 2025

img_map_placeholder

1015 SW 174th Pl, Normandy Park, WA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.