BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Orchard Mesa, Colorado. Completed plans call for site work for a water / sewer project.

It is the purpose of the County to obtain competitive unit prices for all labor, material and equipment necessary for pigging an existing sanitary sewer force main. The work includes pigging and disposal of the wastewater sewage and sludge from the force main system. Immediately following the pigging operations, and prior to starting the lift station, the work by the contractor shall include installation of one new check valve inside an existing manhole adjacent to the lift station pump vault. Finally, the contractor shall replace, with new, the existing AR/AV valve inside the vault location at the intersection of Coffman Road and Hookless Boulevard in Whitewater, Colorado Mesa County reserves the right to accept the proposals or any portion of the proposals by a competent firm, as determined by the statement of qualification and the proposals, which is deemed to be in the best interest of the County. The County reserves the right to accept or reject any portion of the proposals or the entire proposals without disclosing the reason therefore. Any questions or problems with the web page should be directed to Pam Hawkins at 970-244-1765. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com. Pipeline Pigging is a maintenance process used in pipeline systems for cleaning, inspecting, and maintaining the pipelines to ensure efficient operation. The purpose of this proposal is to obtain competitive unit prices for all labor, material, and equipment necessary for pigging an existing sanitary sewer force main. The WORK includes pigging and disposal of the wastewater sewage and sludge from the force main system. The sanitary sewer force main, see Project Documents, is approximately 13,625 lineal feet, 8-inch diameter, C900 polyvinylchloride (PVC) pipe, with a static head-pressure of approximately 120 pounds per square-inch (psi) at the vault. Immediately following the pigging operations, and prior to starting the lift station, the WORK by the contractor shall include installation of one (1) new check valve inside an existing manhole adjacent to the lift station pump vault. Finally, the contractor shall replace with new the existing AR/AV valve inside the vault located at the intersection of Coffman Road and Hookless Boulevard, in Whitewater, CO.

Post-Bid

Water / Sewer

$800,000.00

Public - County

Site Work

47

10

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
17
Bidding Soon
203
All Active Projects
95
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.