Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a road / highway in Tomball, Texas. Completed plans call for site work for a road / highway.
Provide, Construct, and Install Traffic Signals and Related Equipment further defined in the RFP. Tomball ISD - RFP 978-24 Traffic Signals This project is to provide and install Traffic Signals and all necessary equipment and work for a fully functional project at (2) separate locations with different completion dates. Locations listed in chronological order of intended completion. Refer to the probable Schedule of Events to due dates. Location One: TS-01 At or about 11211 FM 2920, Tomball, Texas Location Two: TS-02 At or about 17702 Mueschke Rd, Cypress, Texas Addresses are all within Tomball ISD boundaries. Cost of Work - Total budgeted amount for BOTH locations is $450,000 Should you have additional questions, concerns or ideas regarding the RFP terms please contact: Program Manager Lockwood, Andrews & Newnam, Inc. (LAN) Robert Wilbanks, AIA rwwilbanks@lan-inc.com 832.570.7078 Should you have any questions regarding the design or basis of design, please contact the appropriate design engineer of record. TS-01 - 11211 FM 2920 Quiddity Tyler Cowser, P.E. tcowser@quiddity.com 972.265.6039 TS-02 - 17702 Mueschke Rd. Amani Engineering Mahesh Dutta, P.E., CFM mdutta@amaniengineering.com The intent is to take delivery of the completed project on or before the dates as noted below. TS-01 -Tomball Innovation Center, FM 2920 At or about 11211 FM 2920, Tomball, Texas Proposed Completion Date: November 30, 2024 TS-02 - Tomball West Campus, Mueschke Rd At or about 17702 Mueschke Rd, Cypress, Texas Proposed Completion Date: March 3, 2025 September 4, 2024 N/A Final Evaluations Complete - Recommendation to the BOT is written. September 10, 2024 5:30 P.M. Regular BOT meeting - Presented for Approval September 13, 2024 12:00 P.M. Intended Final Contract Agreement and General Conditions sent to Successful Bidder for Execution. September 13, 2024 12:00 P.M. Intended Notice to Proceed. November 30, 2024 11:59 P.M. TS-01 Substantial Completion Deadline - (FM 2920) March 3, 2025 11:59 P.M. TS-02 Substantial Completion Deadline - (Mueschke Rd)
Award
Roads / Highways
$578,050.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 3, 2024
September 13, 2024
Multiple Locations, Tomball, TX
Related To This Project
Tomball, TX
--
Tomball, TX
--
Tomball, TX
--
Tomball, TX
--
Tomball, TX
--
Tomball, TX
--
Tomball, TX
--
Tomball, TX
--
Tomball, TX
--
Tomball, TX
--
Tomball, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.