BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 23, 2025 at 8:00 PM

Updated October 24, 2025

Demolition, site work and new construction of an educational facility in Memphis, Tennessee. Completed plans call for the construction of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

This project will construct a new College of Medicine Building which will be located at the corner of Madison Ave and Dudley St. The existing College of Medicine facilities, primarily located in the 910, 920, and 930 Madison Avenue buildings, are outdated and insufficient to meet the growing enrollment and instructional demands of UTHSC's health professional programs. These buildings are beyond their useful life and lack the technological infrastructure, flexible instructional space, and collaborative learning environments necessary for modern medical education. This new facility is a critical element of the campus-wide strategy to modernize UTHSC's academic core, replacing functionally obsolete facilities with new, purposebuilt space designed to support interdisciplinary education and expanded class sizes. Advanced planning and programming for the project has been an integral part of UTHSC's strategic and physical planning processes. In addition to its inclusion in the 2020 Campus Master Plan Update, the project has undergone space needs assessments, programming studies, and coordination with academic leadership to determine the necessary capacity, instructional features, and technological infrastructure. The new facility is programmed to accommodate increased enrollment targets, including expanding the Doctor of Medicine (MD) program from 175 to 225 students annually and the Physician Assistant (PA) program from 30 to 60 students per cohort. This expansion aligns with the goals set forth in both the UTHSC Strategic Plan and the THEC Master Plan to increase the number of Tennesseans with postsecondary healthcare credentials. This project has been approved for planning only by the State Building commission with an anticipated total project budget of $350,000,000 and a Bid Target of $251,250,000. The Bid Target amount will be used to establish the Guaranteed Maximum Price (GMP) Target. Throughout the course of the Pre-Construction Phase, the GMP Target is subject to change at the Owner's sole discretion. Construction services will be designed for early release bidding packages with construction duration (to the contractual Substantial Completion) being anticipated for 32 months ending Spring 2029. Liquadated Damages: $2,000.00 Per Day Question Deadline 10/10/2025.

Post-Bid

Educational

$251,250,000.00

Public - State/Provincial

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
53
Bidding Soon
601
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2025

January 2, 2026

Project location map

969 Madison Ave, Memphis, TN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.