BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Priest River, Idaho. Contact the soliciting agency for additional information.

Priest Lake Road Maintenance and Heavy Brushing Project (i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in subpart 12.6 of the Federal Acquisition Regulation (FAR), as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (ii) This solicitation is issued as a Request for Quotation (RFQ). (iii) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2024-05. (iv) This procurement is a total small business set aside. The NAICS code is 115310 and the Small Business Size Standard is $11.5 million. 1.0 Background and Purpose The Forest Service requires road improvement maintenance as well as heavy brushing to be performed within Priest Lake, ID. There will be a total of approximately 18 miles of heavy brushing, and 1.2 miles of roadway excavation / road improvement requirements, with an additional line item of an hourly excavator rate. 3.0 Technical Requirements / Tasks 3.1 Heavy Brushing: The contractor shall cut vegetative growth including trees six (6) inches or less in diameter (when measured 6 inches above the ground) which interferes with the sight distance and drainage features along the roadway. The contractor shall remove all logs and windfall within the specified clearing limits. The clearing limits are shown in the attached typical section. This includes a horizontal distance of ten (10) feet, (or a slope distance of 12 feet) from the bottom of the ditch for the roads with ditches, eight (8) feet horizontal distance (or a slope distance of 12 feet) from hinge without ditch, and a horizontal distance of four (4) feet (or a slope distance of six (6) feet) from the shoulder of the fill side. Clearing shall include turnouts and curves. The clearing limits are shown in the attachment 1. 3.2 Roadway Excavation: 3.2.1 Roadbed Clearing and Grubbing: This work consists of clearing and grubbing vegetation, standing trees, and the removal of logs and windfall within the roadbed, shoulders, turnouts, intersections, ditches, drainage dips, catch basins, surface water deflectors and minor drainage structures. Remove vegetation and obstructions from the work area which interfere with sight distance, road surface maintenance, drainage feature maintenance, and drainage features. Roadbed clearing vegetation stumps do not exceed two (2) inches in height and 1 (1) inch in diameter and shall be cut as not to create a hazard to foot or vehicle traffic or impede roadbed surface maintenance. Vegetation greater than 3 in length and 2 diameter shall be scattered outside of the work area and water courses. Slash and debris shall be scattered downslope from the roadbed and outside of the clearing limits, avoiding any concentration. Remove organic, deleterious, and material larger than 6 inches brought to the surface during clearing and grubbing. Repair soft and unstable areas. Shape to a uniform surface and compact with approved equipment. Please reference the attached full combined solicitation synopsis for all the details, including documentation required for quote submissions. Period of Performance: October 1st,2024 through September 30th, 2025.

Award

Roads / Highways

Public - Federal

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
2
Bidding Soon
99
All Active Projects
30
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.