Site work and paving for a mixed-use development in Wichita, Kansas. Completed plans call for site work for a road / highway; for paving for a road / highway; and sidewalk / parking lot.

2024 OP3 CIP Concrete Street Repairs Phase 1 Question Deadline 09/11/2024 at 12:00 PM CT Location online portal. The Contractor shall read and fully comprehend every aspect of the contract provisions included in this bid proposal prior to submitting a bid for the project. Any questions prior to bid submittal should be directed to Bryan Hamel, Project Engineer, at (316) 268-4047 or bhamel@wichita.gov. Work on Project. Work shall consist of concrete pavement repair which includes concrete panel repair and joint repair. Work also consists of curb & gutter, driveways, valley gutter, sidewalk, and wheel chair ramp repairs on locations as determined by the Engineer. The repair work shall include all costs for removing and reconstructing existing pavement, combined curb and gutter, drives, valley gutter, sidewalk, compaction ofsub-grade, site restoration, and traffic control. On the Southeast Blvd location, asphalt surface repairs to the shoulder adjacent to concrete repairs and also in areas of the shoulder designated by the Engineer will be paid for utilizing the bid item "Shoulder Asphalt Repair (BM-dsPG64-22) (Surface Mix)." All concrete repairs are to be made using concrete mix with the minimum of 620 pounds of cement per cubic yard, AE/HE, and containing 40% rock per cubic yard. All driveway side walk constructed with the high-early strength mixes will be opened to vehicular traffic at the end of a period of 96 hours after placement of such concrete. The only exception is for concrete used for sidewalk and wheelchair ramp construction which could also be 8 sack sand mix as specified in the City of Wichita Standard Specifications. Concrete Pavement Repair, shall be reinforced with 6 x 12, W4 x W4 welded wire mesh. Wire mesh must be supported with the appropriate chairs spaced no greater than 36" apart. Where existing reinforced steel cannot be saved, No. 5 rebars 2'0" long on 24" centers with a minimum of 2 bars in any patch side shall be drilled and epoxied into existing concrete. The epoxy shall be Simpson SET High Strength or equivalent. Hammering rebars into concrete is not allowed. The cost of all the necessary work to complete the repair work, such as full depth saw cut, removal and replacement, is subsidiary to that particular repair bid item. Monolithicedge curbrequired shall matchexistingcurb as closely as possible. All costs for removal and construction of monolithic edge curb will be included in the price bid for that item. All concrete pavement repair, regardless of location, require full-depth saw cuts. All saw cutting, removal, and other work to complete the concrete repair work will be considered subsidiary to bid items. All costs for removal of existing pavement, earthwork, and replacement of pavement shall be included in the price bid for concrete pavement repair. A Bid Bond in the Amount of Five Percent (5%) Of the Total Bid or an Annual Bid Bond is Required Prior to Bid Opening. See Section 102.3 of the City of Wichita Standard Specifications for Further Information. Start Date. The work order on this project shall be issued 20 (twenty) calendar days after the date on which the contract for this project has been awarded to the successful bidder. Project Schedule - Kellogg Drive to be completed first All locations must be completed by March 1st, 2025, or within 100 Working Days.

Post-Bid

Roads / Highways

$600,000.00

Public - City

Paving, Site Work

3

3

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
37
Bidding Soon
347
All Active Projects
138
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 13, 2024

October 3, 2024

March 1, 2025

img_map_placeholder

Multiple Locations, Wichita, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.