BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Davison, Michigan. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a road / highway; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Construction of multi-use sports court, fencing, sidewalk, HMA ADA parking, concrete block retaining wall, and relocation of site lighting. Principal items of work include but are not limited to: 755 Ton HMA 3,000 Syd Aggregate Base, 6 inch 490 Sft Sidewalk, Conc 4 inch 26,800 Sft Color coating 664 Lft Fencing Bids will be received for a single prime Contract: Lake Callis Site Improvements, 2300842 A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent The Work will be substantially complete on or before November 15, 2024, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before May 30, 2025. Davison Township, hereinafter called the Owner, reserves the right to reject any or all Proposals and to waive any formality or technicality in any Proposal in the interest of the Owner Question Deadline 09/24/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Email Doug Schultz, PLA at dschultz@rowepsc.com

Award

Sidewalks / Parking Lot

$883,000.00

Public - City

Outdoor Lighting, Paving, Site Work

24

17

2

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
76
Bidding Soon
1,355
All Active Projects
630
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2024

October 31, 2024

img_map_placeholder

Multiple Locations, Davison, MI


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.