BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 25, 2024 at 7:00 PM

Updated November 26, 2024

Site work for a water / sewer project in Chapin, Illinois. Completed plans call for site work for a water / sewer project.

Construction of approximately 17,000 LF of C-905 16-inch PVC water main; 830 LF of C-900 10-inch PVC water main; and 74 LF of C-900 6-inch PVC water main. Approximately 300 LF of 16-inch C-905 carrier pipe installed in C-905 PVC encasement pipe; approximately 820 LF of 16-inch C-905 carrier pipe installed in a jack and bored 24-inch steel encasement pipe; and 70 LF of 6-inch C-900 carrier pipe installed in a jack and bored 12-inch steel encasement pipe. Site Directions: Site address listed is for Otter Lake Water Commission Office. For project address/location, see plan map. Project is along Route 104 between Auburn and Pawnee. Site Address: 6475 W Montgomery Road

Award

Water / Sewer

$3,260,458.00

Public - County

Site Work

67

15

20

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
58
Bidding Soon
896
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2024

December 23, 2024

Project location map

IL-104, Chapin, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.