Site work and paving for a mixed-use development in Fayette, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; and playground / park / athletic field.

A. The intent of the plans and specifications is to provide for the construction and completion of every detail of the work described therein. It shall be understood that the Contractor shall furnish all labor, material, tools, transportation, and supplies required for all or any part of the work to make each item complete in accordance with the spirit of the contract. It is understood that the apparent silence of the specifications as to any detail or the apparent omission of a detailed description concerning any point shall be regarded as meaning that only the best general practice is to prevail and that only materials and workmanship of the first quality are to be used. A. For the purpose of design and the preparation of the Engineers estimate, the Contracting Authority or its representatives may perform a reasonable amount of exploratory work to gain information relative to surface and subsurface conditions relating to types of soils moisture content, and types and extent of rock strata. 1. This information, when shown on the plans, represents a summary of conditions as of the date the survey was made, it is only an approximate estimation of the site conditions made merely to be suggestive to the Contracting Authority of construction conditions and quantities and classes of work. This information may be used as the bidder sees fit. The appearance of this information on the plans or specifications will not constitute a guarantee that conditions other than those indicated will not be encountered at the time of construction. 2. The bidder is advised that all information concerning the project, compiled by the Contracting Authority preceding the design, is available for examination at the Contracting Authority's headquarters. The prospective bidder shall conduct an examination as provided in 1102.06 to satisfy himself as to the character of the work to be done, the probable construction conditions, and any other reasonably ascertainable conditions and the potential effect these could have on the performance of work under the contracts which shall be the basis for the bid to be prepared. B. Any bidder interested in the work is authorized to make whatever additional investigation he considers advisable. In making such additional investigation, the bidder is directed to the Engineer for information relating to available right-of-way. If there are, at that time, any parcels of land over which the Contracting Authority does not have jurisdiction, right-of-entry must be secured by the prospective bidder from those authorized to grant such permission. 1. All such additional investigation work shall be performed without costing or obligating the Contracting Authority in any way. Question Deadline 09/13/2024 at 12:00 PM CT All Substitution Requests And Questions Must Be Submitted By 12:00pm The Friday Prior To The Bid Letting To Be Considered. This project consists of patching, crack and joint cleaning and filling on PCC pavement, installing signs, PCC paving a side road return, placing shoulder rock and a double chip seal on an HMA road at Volga River State Recreation Area in Fayette County. Proposal Guarantee: $12,500.00 Completion Date: 10/20/2025 Each bidder shall accompany the bid with a bid security as defined in Iowa code section 26.8. Copies of the bid security will be accepted for those bidders submitting bids electronically. Additionally, if the apparent lowest responsible, responsive bidder submits an electronic bid security, the original security must be mailed to the Department, at 6200 Park Avenue, Suite 200, Des Moines, IA, 50321, within five business days of the bid letting date. The bid security must be in an amount set forth in the bidding documents and made payable to the Iowa Department of Natural Resources. Failure to execute a contract for the proposed work and file an acceptable Performance Bond, in an amount equal to 100% of the contract price and a certificate of liability insurance, within thirty days of the date of the award of the contract, will be just and sufficient cause for the rescinding of the award and the forfeiture of the bid security.

Award

Roads / Highways

$125,386.00

Public - State/Provincial

Paving, Site Work

15

10

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
34
Bidding Soon
341
All Active Projects
198
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2024

October 21, 2024

img_map_placeholder

10225 Ivy Rd, Fayette, IA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.