BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 11, 2024 at 8:00 PM

Updated September 12, 2024

Renovation of a fitness / recreation center in Portsmouth, Virginia. Conceptual plans call for the renovation of a fitness / recreation center.

Update: https://www.portsmouthva.gov/ArchiveCenter/ViewFile/Item/4501 Improvements at recreational facilities to include repair and replacement of roof systems, repair of exterior wall and window systems, repair of interior walls, repairs to flooring systems, interior lighting upgrades and other miscellaneous facility repairs. Project scopes and estimates are based on the recreation center evaluations conducted by Clark Nexsen. Additional renovations include recreation center aesthetics such as exterior and interior painting, exterior lighting, and signage. Funding is adequate to complete a Feasibility Study for recreation facilities at schools and preliminary engineering for said facilities. More comprehensive funding can be appropriated to a new project by council. As of September 11, 2024, this project is included in the City's 2025-2029 Capital Improvement Program (CIP) Page 264 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Improvements at recreational facilities to include repair and replacement of roof systems, repair of exterior wall and window systems, repair of interior walls, repairs to flooring systems, interior lighting upgrades and other miscellaneous facility repairs. Project scopes and estimates are based on the recreation center evaluations conducted by Clark Nexsen. Additional renovations include recreation center aesthetics such as exterior and interior painting, exterior lighting, and signage. Funding is adequate to complete a Feasibility Study for recreation facilities at schools and preliminary engineering for said facilities. More comprehensive funding can be appropriated to a new project by council. The project is include in the city's 2024-2028 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Fitness / Rec Centers

$1,750,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
72
Bidding Soon
1,202
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

Multiple Locations, Portsmouth, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.