BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2024 at 8:00 PM

Updated September 19, 2024

Site work and paving for a mixed-use development in Ottumwa, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project is a unit price contract for PCC panel replacement on selected streets. Work will consist of full depth saw cutting, pavement removal and placement of PCC patches. Targeted areas will address panel failures and faulting /settlement issues. This project also includes curb and gutter repairs on East Main Street. 10% Bid Deposit 100% Performance and Payment Bond Project Start Date: After issuance of Notice to Proceed. Project Completion: November 30, 2024 Liquidated Damages: $200.00 per day. Engineer's Opinion of Cost: $175,000.00 Project Contact: Phillip Burgmeier, PE City Engineer (641) 683-0680

Post-Bid

Roads / Highways

$175,000.00

Public - City

Paving, Site Work

9

5

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
101
Bidding Soon
1,293
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2024

October 18, 2024

Project location map

Multiple Locations, Ottumwa, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.