Demolition and site work for a mixed-use development in Moulton, Alabama. Completed plans call for the demolition of a detention facility; and for site work for a detention facility.
Scope of Work: The project includes complete Demolition of the three-level-plus partial basement Courthouse Annex #2 and the existing freestanding three-level Jail building. Demolition to include buildings, foundations, adjoining steps, site walls, ramps, concrete and asphalt paving, utilities, and salvage of some items. Scope of Work will also include new water, storm, and sanitary work in addition to capping of some utilities. The existing building adjoining the north wall of the courthouse adjoins the courthouse construction. Since no existing drawings are available, the north wall demolition will be a repeated process of limited wall demolition to verify the existing conditions before proceeding. Adjoining existing buildings to the north and south are to remain operational at all times. The remaining south facade at the building to the north is to be repaired and receive a new finished veneer included in Allowance #1. Civil scope includes infill of building footprints following demolition, limited site grading as required for a new gravel parking lot and site modifications as indicated on Civil drawings. Work includes owner-requested salvaging of all swinging cell doors with bars and exterior spiral stair. See asbestos surveys and abatement specifications. Martin & Cobey Construction Co., Inc. will act as CM, and Owner's Representative, Kelly Howard, will be on-site contact. Drawings and Project Manual will be open to public inspection beginning Tuesday, September 4, 2024, at the offices of the Lawrence County Annex #3; Martin & Cobey Construction, Inc. at 520 Lawrence Street, Moulton, Alabama; CMH Architects, Inc. Bidders must call the Owner and Architect's office at least 24 hours in advance to arrange a time to review the documents. These documents cannot be removed from the Owner's or Architect's office, nor will any copies of these documents be provided to bidders. All bidders must submit three (3) copies of their bids on proposal forms furnished by the Architect or copies thereof. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975 and must show evidence of license before bidding or bid will not be received or considered by the Architect; the bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered. The successful bidder must provide evidence of enrollment in the E-Verify program per The Alabama Immigration Law (also referred to as "Act 2011-535" and codified in state law as Title 31, Chapter 13 of the Code of Alabama 1975) and amended by Act No. 2012-491 (2012) before awarding of contract. The Owner reserves the right to reject any or all of the proposals and to waive technical errors if, in the Owner's judgement, the best interest of the Owner will thereby be promoted. Performance time: The project is a single-phase project and is to be completed within 120 calendar days from Notice to Proceed. Liquidated damages apply to this project per the Supplementary Conditions.
Post-Bid
Municipal
$117,000.00
Public - County
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 24, 2024
October 24, 2024
750 Main St, Moulton, AL
Related To This Project
Moulton, AL
Bid Date: Nov 08 2024
Moulton, AL
Bid Date: Oct 31 2024
Moulton, AL
Bid Date: Jun 28 2024
Moulton, AL
Bid Date: May 13 2024
Moulton, AL
Bid Date: May 17 2024
Moulton, AL
Bid Date: Mar 12 2024
Moulton, AL
Bid Date: Feb 22 2024
Moulton, AL
Bid Date: Dec 20 2023
Moulton, AL
Bid Date: Dec 05 2023
Moulton, AL
Bid Date: Dec 05 2023
Moulton, AL
Bid Date: Dec 05 2023
Moulton, AL
Bid Date: Nov 15 2023
Moulton, AL
Bid Date: Jan 23 2024
Moulton, AL
Bid Date: Nov 01 2023
Moulton, AL
Bid Date: Nov 16 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.