BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Newport Beach, California. Completed plans call for site work for a water / sewer project.

Project Type Bid Response Types Line Items Subcontractor Bid Bond General Attachment (required) Bid Bond (required) Type of Award Lump Sum License Requirements A Liquidated Damages $1,000 per day Estimated Bid Value $8,300,000.00 Project Duration 300 consecutive working days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 10/10/2024 at 12:00 PM PT Online Q&A Yes The work necessary for the completion of this contract includes, but is not limited to, mobilization, traffic control, water pollution control, potholing and field verifications of existing utilities, trench construction, dewatering, removing an abandoned 12-inch cast iron water main in Alley 402-A, furnishing and installing conduit with poly-pull ropes including service lateral runs, utility pullboxes, handholes, vaults and all associated items necessary for the conversion of existing overhead electrical power, telephone, and cable television services to underground locations as required and intended by the Plans, Specifications, and further specified by Southern California Edison, AT&T and Spectrum standards within UNDERGROUND UTILITY ASSESSMENT DISTRICT NO. 124 (PHASE 2). Any costs resulting from work performed that was directed by Southern California Edison, AT&T and Spectrum engineers, inspectors or other personnel will not be compensated unless said work was approved by the Engineer prior to work commencing. Contractor shall perform all trenching, backfill, pavement restoration, resurfacing and replacement of existing improvements (public or private including but not limited to driveways, fences, walls, signs, landscaping, mailboxes, and other such items) associated with or resulting from the work identified herein. Sidewalk Boring Locations for Utility Undergrounding: 1. 1109 Balboa Avenue 2. 200 Apolena Avenue Pavement Restoration Alley's - 4" Thick Fine AC Hot-Mix (Trench Width Only) Streets -8" Thick Concrete (T - Trench) Estimated at 12,000 SF AD 124 - Mixed Use Residential & Commercial 10-ft. Alley's - Balboa Island Protection of Existing Water Mains

Bid Results

Water / Sewer

$5,687,675.00

Public - City

Site Work

56

12

2

6

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
105
Bidding Soon
2,386
All Active Projects
1,046
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2024

January 13, 2025

img_map_placeholder

Multiple Locations, Newport Beach, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.