BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 30, 2024 at 8:00 PM

Updated October 1, 2024

Demolition, site work, renovation and addition to an educational facility in Cuero, Texas. Completed plans call for the addition of a 3,920-square-foot, three-story above grade educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

SCOPE OF WORK: In general, the project consists of an CUERO HIGH SCHOOL AG SHOP ADDITION of approximately 3,920 SQFT. Building construction consists of but is not limited to: demolition, dirt work, utility work, concrete slab and foundation, pre-engineered metal building, prefinished metal roofing and wall panels, steel studs and drywall, masonry, steel doors, overhead doors, paint, athletic equipment, plumbing, HVAC, and electrical.

Post-Bid

Educational

$1,030,000.00

Public - City

Addition, Demolition, Renovation, Site Work

51

39

4

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
64
Bidding Soon
1,293
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2024

November 29, 2024

Project location map

920 E Broadway St, Cuero, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.