BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 10, 2024 at 7:00 PM

Updated December 11, 2024

Site work and paving for a civil project in Portland, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The NW Johnson and NW Kearney Street: NW 9th Ave to NW Broadway LID Local Improvement District (LID) Project (Johnson/Kearney Project) is a Portland Bureau of Transportation (PBOT) project that will construct new streets in NW Portland at the site of the former United States Postal Service (USPS) site. Improvements include grading, drainage, paving, striping, signing, illumination, signals, roadside development, and landscaping. The Johnson/Kearney Project will construct the extension of two streets (Johnson and Kearney Streets) and a portion of NW Park Avenue on the former United States Postal Service site ("USPS site") in NW Portland, and make modifications to NW 9th Avenue, NW Johnson (between NW 9th Avenue and NW 10th Avenue) and adjacent intersections. These transportation improvements are associated with redevelopment of the USPS site, which is owned by the City of Portland and part of the larger Broadway Corridor redevelopment effort led by Prosper Portland, the City of Portland's economic development agency. Notice to proceed - work begins January, 2025 Question Deadline 09/25/2024 Questions and requests for clarification regarding this Request for Proposal must be directed in writing, via email to the person listed below. The deadline for submitting such questions/clarifications is seven (7) days prior to the proposal due date. An addendum will be issued no later than 72 hours prior to the proposal due date to all recorded holders of the RFP if a substantive clarification is in order. Mahn Saechao, Senior Procurement Specialist Mahn.Saechao@portlandoregon.gov The anticipated cost for the construction services described herein is estimated to be between $15,000,000 and $18,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The City of Portland Bureau of Transportation (PBOT) is seeking proposals from qualified firms, teams or contractors, hereafter called "Proposer(s)," with demonstrated experience in construction of street improvements (grading, striping, signing, signals and roadside development), and proposes to engage the successful Proposer for the following services: Preconstruction Submittals: 1. Submit preconstruction submittals according to City of Portland Standard Specifications 2020 and Project Special Provisions outlined in Exhibit B. Construction Services: 1. Construct improvements outlined in Exhibit A - Contract Plans and in accordance with requirements outlined in Exhibit B - Special Provisions. 2. Implementation and management of plans developed during Preconstruction Submittal Phase (Construction Staging, Schedule, Traffic Control and Contaminated Media Plan) Improvements shall consist of those items of work listed in the Proposal and as shown on the accompanying Plans. The Contractor shall perform all labor, and furnish all materials, equipment and incidentals required to make each item complete. Work shall include, but not be limited to: 1. Construct, maintain, and remove temporary work zone traffic control measures. 2. Construct, maintain, and remove erosion control measures. 3. Perform all removal of structures and obstruction, clearing and grubbing, and earthwork operations. 4. Construct drainage system including water quality facilities, sewer pipes, maintenance holes and inlets. 5. Construct roadway improvements including cold planing, aggregate base, ACP wearing surfaces, concrete curb and sidewalks. 6. Place pavement markings and striping. 7. Install signing. 8. Install illumination. 9. Install traffic signals & OCS Pole. 10. Roadside development including seeding, planting, fencing, mailboxes and irrigation. 11. Install water main, vaults, hydrants and corrosion control.

Award

Roads / Highways

$18,000,000.00

Public - City

Paving, Site Work

320

14

24

10

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
46
Bidding Soon
1,048
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2024

January 17, 2025

Project location map

Multiple Locations, Portland, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.