Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Coral Springs, Florida. Completed plans call for the renovation of a water / sewer project.
Professional Consulting Services For Membrane Water Treatment Plant Scope of work shall be inclusive of all disciplines and components required for a fully operational facility. These disciplines include but are not limited to process mechanical, civil, landscape, architectural, structural, plumbing, HVAC, electrical, hydrogeologic, geotechnical, instrumentation and controls, physical and cyber security. The scope of the work shall incorporate the necessary infrastructure to facilitate a stabilized blending of membrane water with lime softened water, as an initial operating approach. Fullscale 100% membrane softened water production shall be available from the WTP by fourth quarter-2031. The existing Lime-Softening Plant shall be decommissioned thereafter. The scope of work included in this Feasibility Study includes: Review Existing Water Quality and Treatment Facilities This task includes collecting and reviewing current data on the plants raw water source, the current South Florida Water Management District (SFWMD) Water Use Permit (WUP), raw water quality and quantity, historical water production, water system regulations, and the existing treatment facilities. Develop Design Criteria This task includes establishing the design criteria for the finished water quality, current and future demand scenarios, current and future regulatory requirements, potential emerging contaminants, primary and emergency power requirements, building design criteria, plant capacity, and potential blending scenarios. Identify Regulatory Permit Requirements This task consists of identifying all applicable regulatory requirements and permits. Evaluate Existing Treatment Processes This task includes evaluating existing treatment systems against the design criteria. It also includes addressing the ability to meet future scenarios and issues along with alternative raw water sources (i.e., Floridan aquifer). Identify Proposed Process Components and Facilities This task includes preparing a proposed facility process flow diagram, identifying all proposed major process components, identifying existing facilities that will remain, and evaluating the use of energy-recovery devices. Evaluate Alternative Treatment Process This task includes evaluating an alternative membrane softening process to meet the design criteria. It includes describing the finished water quality of the proposed membrane process, addressing blending scenarios, addressing the ability to meet future issues, and addressing the ability to add an alternate raw water source (i.e., Floridan aquifer).
GC Bidding
Water / Sewer
$400,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 4, 2024
January 3, 2025
3800 NW 85th Ave, Coral Springs, FL
Related To This Project
Coral Springs, FL
Bid Date: Oct 16 2024
Coral Springs, FL
--
Coral Springs, FL
Bid Date: Nov 06 2024
Coral Springs, FL
--
Coral Springs, FL
Bid Date: Oct 28 2024
Coral Springs, FL
Bid Date: Dec 11 2024
Coral Springs, FL
Bid Date: Aug 05 2024
Coral Springs, FL
Bid Date: Jul 24 2024
Coral Springs, FL
Bid Date: Jul 31 2024
Coral Springs, FL
Bid Date: Jul 10 2024
Coral Springs, FL
Bid Date: Oct 14 2021
Coral Springs, FL
--
Coral Springs, FL
Bid Date: Jul 02 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.