BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a pre-engineered storage facility in Lakewood, Colorado. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Reference Number 0000362182 Job Location: 6325 W Mississippi Avenue Lakewood, CO 80226 This project entails a new single-story (plus mezzanine) storage facility specifically tailored to house fire apparatus. The facility will serve as a secure, climate-controlled environment to protect valuable firefighting equipment, including fire trucks, emergency vehicles, and related gear. The storage facility is designed with both functionality and durability in mind, ensuring that all equipment is kept in optimal condition, ready for deployment in emergency situations. Question Deadline 10/08/2024 at 3:00 PM MT Questions are submitted online Yes The construction budget is approximately $5.7M. The Project is estimated to achieve Substantial Completion on or before February 2026. Permits are anticipated to be received no later than February 15, 2025. The Contractor shall commence the Work no later than the commencement date stated in the Notice to Proceed issued by the Owner (currently estimated to be no later than April 15, 2025). Substantial Completion is currently estimated to be no later than 5:00 pm (MDT) on February 28, 2026. Buyer Preferences, Guidelines & Requirements General Requirements - Bidder Prequalification/Preregistration Required - Contractors License Required - Insurance Required - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % The Owner reserves the right to reject any and all proposals, to waive informalities, and to reject non-conforming or non-responsive proposals.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$5,700,000.00

Public - City

New Construction, Site Work

112

27

11

5

Subscribe For Documents

156 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
56
Bidding Soon
1,008
All Active Projects
418
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2024

February 15, 2025

img_map_placeholder

6325 W Mississippi Ave, Lakewood, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.