BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 6, 2024 at 7:00 PM

Updated December 7, 2024

Site work for a playground / park / athletic field in Irvine, California. Completed plans call for site work for a playground / park / athletic field.

The work to be performed shall include, but not be limited to: The construction of eight new pickleball courts, approximately 85,000 square feet, four shade structures, picnic tables, benches, drinking fountains, and site lighting improvements. The existing bike path will be redesigned and rerouted to accommodate the eight new pickleball courts. The existing restroom building will also be demolished and replaced with a pre-engineered restroom building, and other items not mentioned here, but required by the plans and the Special Provisions. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $6,700 per Calendar Day; and $950 per Calendar Day, for each Calendar Days delay in completing the plant establishment work in excess of the number of Working Days prescribed. In no case more than $6,700 per Calendar Day. Start/Delivery Date January 2025 Project Duration 240 Working Days (excluding plant establishment) and 300 Working Days (including plant establishment) from the date specified in the Notice to Proceed. The CITY reminds all contractors and subcontractors of the adoption of Senate Bill 96 - Amendments to California Prevailing Wage Law Requires Additional Measures by Public Agencies, Contractors and Subcontractors, and encourages them to understand and comply with the requirements as set forth on the Department of Industrial Relations (DIR) website at http://www.dir.ca.gov/Public-Works/PublicWorks.html. All contractors and subcontractors who plan to bid on a public works project when the project is for construction, alteration, demolition, installation, or repair work with a value exceeding $25,000.00 must first be registered and pay an annual fee with the DIR. Additionally, all contractors and subcontractors who plan to bid on public works projects involving maintenance work with a value exceeding $15,000.00 must first be registered and pay an annual fee with the DIR. The CITY requires all contractors and subcontractors to be registered with the DIR prior to submitting a bid meeting these parameters. Subject to the exceptions set forth in Labor Code Section 1725.5, bids from contractors that are not currently registered will be deemed nonresponsive. Further, the CITY will not award a contract to and no contractor or subcontractor will be allowed to work on a CITY public works project meeting these parameters unless they are registered with the DIR pursuant to Labor Code Section 1725.5. Please visit the DIR website for further information. Question Deadline 09/24/2024 at 4:00 PM PT Online Q&A Yes

Award

Playgrounds / Parks / Athletic Fields

$6,061,028.00

Public - City

Site Work

98

26

22

7

Subscribe For Documents

89 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
597
Active Projects
290
Bidding Soon
4,004
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2024

January 15, 2025

Project location map

20 Lake Rd, Irvine, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.