Site work for a water / sewer project in Modesto, California. Completed plans call for site work for a water / sewer project.
The project will reroute sanitary sewer flows out of the current River Trunk Pipeline between the Gallo Winery property and the Sutter Avenue Primary Treatment Facility (SAPTF). The existing River Trunk runs adjacent to the Tuolumne River and is at risk of failure during a large storm event. The Project includes a new gravity sewer pipeline from the Gallo Property, under Dry Creek, to the new River Trunk Pump Station located at the intersection of Morton Boulevard and B Street. Sanitary sewer flow will then be pumped in a new dual forcemain, across the flood plain, to the intersection of Tuolumne Boulevard and Neece Drive. The City is currently completing construction of a new gravity pipeline from the intersection of Tuolumne Boulevard and Neece Drive to the Sutter Avenue Treatment Plant. The Project also includes new gravity pipelines to reroute flows from existing local collection pipelines to the new River Trunk Pump Station. License Requirements "A" California State Contractor License Question Deadline 10/28/2024 Email all questions to: River_Trunk_Pump_Station_Bid_Questions@docs.e-builder.net The Owner anticipates that the Project will consist of the following general project elements: 1. River Trunk Pump Station: Includes a 40 million gallons per day (mgd) pump station structure and all appurtenances within, including but not limited to, pumps, discharge piping, flow meter vault, overflow structure, connection to existing River Trunk, electrical building, transformer, biofilter, generator, fuel tank and all other site work and drainage. 2. Alignment "A" - Dry Creek Crossing to RTPS: Includes a 48-inch pipeline that will convey flow from the Gallo Winery Property to the new River Trunk Pump Station. The pipeline will be microtunnelled under the Dry Creek and across the flood plain to the proposed pump station site. This section of the project also includes a diversion structure and vortex drop structure at the Gallo Property as well as some connection of domestic lines. 3. Alignment "B" - 9th Street Connection: Includes a 15-inch gravity line that connects the 9th Street sewer to the River Trunk Pump Station. 4. Alignment "C" - B Street Connection: Includes a 21-inch and 36-inch gravity line that flows from the intersection of Tuolumne Boulevard and Calaveras Avenue, along B Street to the River Trunk Pump Station. This section of the project includes a trenchless installation through the Tuolumne Boulevard and 7th Street intersection. 5. Alignment "D" - Dual Forcemains: Includes a 30-inch and 42-inch forcemain that runs from the proposed River Trunk Pump Station, across the flood plain, and up to the intersection of Tuolumne Boulevard and Neece Drive. This section of the project includes a trenchless installation beneath the railroad and 7 th Street bridge structures
Post-Bid
Water / Sewer
$700,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 12, 2024
December 12, 2024
Multiple Locations, Modesto, CA
Related To This Project
Modesto, CA
Bid Date: Sep 14 2020
Modesto, CA
Bid Date: Oct 17 2024
Modesto, CA
--
Modesto, CA
Bid Date: Oct 15 2024
Modesto, CA
Bid Date: Dec 12 2024
Modesto, CA
Bid Date: Oct 15 2024
Modesto, CA
Bid Date: Oct 08 2024
Modesto, CA
Bid Date: Sep 17 2024
Modesto, CA
--
Modesto, CA
Bid Date: Sep 17 2024
Modesto, CA
Bid Date: Aug 30 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.