BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 4, 2024 at 7:00 PM

Updated December 5, 2024

Site work for a water / sewer project in Warrington, Florida. Completed plans call for site work for a water / sewer project.

https://www.bizjournals.com/tampabay/news/2024/11/06/palmetto-breaks-ground-on-infrastructure-project.html Palmetto has begun a $6 million infrastructure project to improve water systems and roadways throughout the city. The project broke ground on Oct. 29 and was funded with $2.5 million from the state, the remainder from American Rescue Plan Act funding and municipal dollars. Mayor Shirley Groover Bryant said it was a “long-anticipated project” and thanked State Sen. Jim Boyd and State Rep. Will Robinson for helping obtain funding in the state budget for the project. “We knew it would take more funding, so we reached out requesting state appropriations, and I guess you might say the rest was history because our commission embraced the idea, and we reached out to some honored guests in Tallahassee,” Bryant said in a statement. Palmetto’s Ward 1, Phase III project will specifically target infrastructure in the city’s northeastern sector. The project will bring new water and sewer lines and improve stormwater drainage to residents living east of 14th Avenue W and north of 10th Street E. Once the aging water lines are replaced, crews will install Americans with Disabilities Act-compliant sidewalks and later repave the residential streets in the area. Palmetto is experiencing a significant wave of growth. Several developers have recently invested in multifamily housing projects in the city, and earlier this year, Detwiler’s Farm Market broke ground on a new warehouse and distribution center at the Florida International Tradeport. SeaPort Manatee recently received $9.5 million from Gov. Ron DeSantis following severe damage from Hurricane Milton. Initial damage assessments estimate roughly $225 million in potential losses at the port, one of the city’s largest economic drivers. ____________________________ The E. Palmetto Avenue and Live Oak Drainage Improvement project is located west of Pensacola, in unincorporated Escambia County. The project area is along E. Winthrop Avenue and E. Palmetto Avenue between S. 2nd Street and Live Oak Avenue. This project will include the installation of a collection and conveyance storm water system with a filtration device and the grading of existing ditches located in the right-of-way (ROW). The project area is in an older subdivision with little to no existing storm water infrastructure. The area is known to have flooding and hazardous ditches. The Drainage Improvements include the addition of a storm water drainage system that will be located in the E Winthrop Avenue and E Palmetto Avenue ROW. The storm water system will tie into existing infrastructure in two locations via an existing drainage manhole to along E. Winthrop Avenue and a proposed doghouse manhole in the E. Palmetto Avenue ROW. Treatment will be provided through a Filtration Device that is to be installed along the existing 42 storm pipe located in a county easement adjacent to E Palmetto Avenue. Question Submission Deadline: September 23, 2024, 4:00pm pre bid notes : Dial in by phone +1 863-333-5817,,315068529# United States, Lakeland (863) 333-5817,,315068529# United States (Toll-free) Find a local number Phone conference ID: 315 068 529# Each offer shall be accompanied by a bid bond, cashiers check, or certified check in the amount of 5% of the total offer. The County Must require the successful Offeror(s) to furnish separate Performance and Payment bonds, under pledge of adequate surety and covering up to 100% of the dollar value of the award / an amount specified (i.e. $5,000.00) on the forms provided by the County the vendor shall pay to the County, as liquidated damages, the sum of One Thousand, Six Hundred Eighty-Five Dollars ($1685.00) . The work included in this agreement shall be substantially completed within Two Hundred Ten (210) consecutive calendar days from the date of the written Notice to Proceed. The bidder has an additional Thirty (30) consecutive calendar days from the date of substantial completion for a total number of Two Hundred Forty (240) consecutive calendar days to Final Completion. Escambia County reserves the right to waive any informalities or reject any and all bids, in whole or part, to utilize any applicable state contracts in lieu of or in addition to this bid, and to accept the bid that in its judgment will best serve the interest of the County

Award

Water / Sewer

$1,332,971.00

Public - County

Site Work

30

17

9

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
61
Bidding Soon
876
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2024

December 10, 2024

Project location map

Multiple Locations, Warrington, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.