BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Atlantic City, New Jersey. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of 10/31/24, this project has not yet been awarded. A timeline for award has not yet been established. Priority Repairs of Central Avenue Bridge Over Patcong Creek in Egg Harbor Township The project consists of priority repairs and reconstruction of the deck wearing surface to the Central Avenue Bridge (EH-11) over Patcong Creek in the Township of Egg Harbor & City of Linwood. The three (3) priority repairs were identified in the bridge inspection on March 26, 2019 and consist of the following: o Heavy scaling to the south end of the east abutment. o Heavy scaling to the south end of the west abutment. o Large spall to thew underside of the deck at the east end of bay 7. In addition the work consists concrete encasement spall repairs including cleaning and painting exposed steel before spall repairs, reconstruction of the deck wearing surface, the replacement of a masonry retaining wall located within the right of way of Central Avenue adjacent to a historic property (Block 5507 Lots 1 & 2) and temporary soil erosion and sediment control measures. The wall retains fill along Central Avenue for the historic property. Major work items: Retaining Wall, Stone Strong Systems or equivalent, replacement of existing guide rail, Hot Mix Asphalt 12.5M64 Base Course, Variable Thickness, Concrete Underdeck Repair, Type B, Concrete Encasement Repair and Concrete Abutment Repair, Type B. Traffic control will be alternating in only one direction of travel along Central Avenue at a time, unless otherwise approved by the Township Engineer. Any Questions Concerning This Specification Must Be Submitted in Writing Through the online Electronic Bidding Portal Question Section of the Specific Bid Questions Must Be Submitted No Later Than September 9, 2024. Bidders Are Required to Comply With Requirements of Njsa 10:5-31 Et Seq. And N.j.a.c. 17:27. Every Bidder Must Abide by the New Jersey Prevailing Wage Act,. Njsa 34:11-56.27 Et Seq.

Bid Results

Bridges / Tunnels

$946,660.00

Public - County

Paving, Site Work

15

7

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
63
Bidding Soon
1,455
All Active Projects
591
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2024

October 21, 2024

img_map_placeholder

Central Ave, Atlantic City, NJ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.