BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2025 at 7:00 PM

Updated March 6, 2025

Renovation of a military facility in Pemberton, New Jersey. Completed plans call for the renovation of a military facility.

The scope of work includes the completion of all non-construction tasks associated with the recommended construction tasks found in the Preservation Plan (Attachment B). All work must be completed by consultants who meet or exceed the Secretary of the Interior's Standards for the Treatment of Historic Properties. The non-construction tasks include: o Preparing design and contract documents including a project manual and technical specifications for each phase of work proposed, o providing administration services of the construction contract for each phase of work proposed, o ensuring that all work meets the requirements of the Preserve New Jersey Historic Preservation Fund Grant, o preparing and acquiring permits and approvals, and o organizing team meetings and presentations. The New Jersey Prevailing Wage Act, N.J.S.A. 34:11- 56.25 et seq. is hereby made part of every contract entered into on behalf of the Pinelands Commission, except those contracts which are not within the contemplation of the Act. The contractor's/vendor's signature on the proposal/bid is his/her guarantee that neither he/she nor any subcontractors he/she might employ to perform the work covered by the proposal/bid has been suspended or debarred by the Commissioner, Department of Labor and Workforce Development for violation of the provisions of the Prevailing Wage Act and/or the Public Works Contractor Registration Acts; the contractor's/vendor's signature on the proposal/bid is also his/her guarantee that he/she and any subcontractors he/she might employ to perform the work covered by the proposal/bid shall comply with the provisions of the Prevailing Wage and Public Works Contractor Registration Acts, where required. CCE: $1,150,000.00 The total budget includes costs for non-construction and construction activities required to complete the project. The Commission prioritizes the completion of all of the "Phase I" tasks outlined in the Fenwick Manor Preservation Plan (Attachment B, pages 96-101). A pre-bid site visit to the Fenwick Manor is strongly recommended as it will help bidders gain a better understanding of the space, site constraints and existing conditions of the building. The Commission will hold an "open house" for any bidder's interested in touring the building/property on Wednesday February 12, 2024, between the hours of 8:00 am and 4:00 pm Questions Due - Friday, February 21, 2025 (by 4:00 pm) Questions/Answers Posted on website - Wednesday, February 26, 2025 (by 4:00 pm)

Post-Bid

Military

$1,150,000.00

Public - State/Provincial

Renovation

11

16

4

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
897
Active Projects
468
Bidding Soon
6,577
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2025

May 5, 2025

Project location map

15 Springfield Rd, Pemberton, NJ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.