Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a detention facility in New Hanover, New Jersey. Completed plans call for site work for a detention facility.
FCI FORT DIX NJ STATEMENT OF WORK INSTALL DOMESTIC BACKFLOW PREVENTERS INTRODUCTION The Federal Correctional Institution (FCI) located at Fort Dix, New Jersey, intends to make a single award to a responsible entity for supply and installation of domestic backflow preventers and Y (Wye) strainers as set forth in this solicitation/contract. The Government reserves the right to award without discussion and to make a single award. Therefore, each initial quoted should contain the best terms from a cost or price standpoint. PLACE OF PERFORMANCE FCI Fort Dix 5755 Hartford Road Joint Base MDL, New Jersey 08640 SCHEDULE OF DELIVERY PERFORMANCE The contractor will provide all labor, material, and equipment necessary to supply and install domestic backflow preventers and Y (Wye) strainers throughout the institution. The domestic backflow preventers and strainers MUST comply with the U.S. EPA Safe Drinking Water Act. The domestic backflow preventers shall be reduced pressure zone assembly for potable water (RPZ). The Y (Wye) strainers shall be approved for potable water. The strainers shall contain no PVC or plastic. A specification sheet of products being installed shall be provided to the COR and approved prior to installation. The Y (Wye) strainers shall be installed upstream from the domestic backflow preventer(s) and shall contain an isolation valve for servicing the strainer. The contractor must be licensed to perform work in the state of New Jersey and must provide licensure and/or certifications prior to award. SCHEDULE OF PERFORMANCE Normal working hours are estimated Monday thru Friday 7:00AM-3:00PM to exclude federal holidays. Saturday and Sunday hours may be utilized due to adverse weather conditions or other contributing factors that would cause delay if approved by the COR and the contractor. The contractor cannot be guaranteed a forty (40) hour work week at the work site. EXISTING SITE CONDITIONS The buildings listed below do not have a domestic backflow preventer(s) and/or strainer(s) installed currently. The contractor will verify all sizing prior to installation. The contractor shall install a total of twenty-six (26) backflow preventers with Y strainers, with the following breakdown: Three (3) 2 1/2 " Backflows, One (1) 4" Backflow, Twenty-One (21) 2" Backflow, and One (1) 1 1/4 " Backflow. Building 5733: 1 1/4 " Building 5714: 2" Building 5732: 2" Building 5705: 2" Building 5720: 2" Building 5805: 2" Building 5814: 2" Building 5833: 2" Building 5832: 2" Building 5834: 2" Building 5835: 2" Building 5843: 2" Building 5844: 2" Building 5850: 2" Building 5854: 2" Building 5855: 2" Building 5734: 2" Building 5735: 2" Building 5743: 2" Building 5754: 2" Building 5753: 2" Building 5754: 2" Building 5756: 4" Building 5740: 2 1/2 " Building 5731: 2 1/2 " Building 5710: 2 1/2 " The contractor shall ensure the backflow preventers are secured to an existing wall or an installed support bracket to be furnished by the contractor. TESTING EQUIPMENT All domestic backflows, piping, and/or other fittings will be tested for leaks and certified. Documentation will be provided to the COR confirming inspection test was conducted with passing results. DELIVERY OF MATERIALS All construction related equipment and materials required for the contractor to work on this project will be processed by the contractor and delivered to the contractors approved storage area. Any construction related deliveries which are delivered on site, can be received by the contractor Monday through Friday, excluding Federal Holidays between the hours of 7:00AM - 3:00PM. The contractor will be required to notify the COR when a delivery is scheduled, and a contractor representative must be present at time of delivery. FINAL INSPECTION AND WARRANTIES: The contractor at a minimum shall meet manufacturer recommendations, and industry standards set forth in accordance with all federal, state, and local regulations. Upon the completion of the installation, the contractor will inspect and verify all work is completed to the satisfaction of the Contract Officer Representative (COR). The contractor shall warrant its products and labor for a minimum of twelve (12) months. STORAGE OF TOOLS, MATERIALS, AND EQUIPMENT Any contractor materials, tools, and/or equipment that will be required to be brought on site for an extended period to expedite the project completion shall be permitted to be stored in a previously approved location agreed upon by the Contract Officer Representative (COR) and the contractor. Any tool considered a high security risk will be required to exit the institution grounds daily. CONSTRUCTION PROGRESS MEETINGS The Contract Officer Representative or Facility Manager reserve the right to require weekly or bi-weekly progress meetings with the contractor(s) project manager to ensure scheduling requirements are met in accordance with this contract. Meetings shall include but not limited to pre-construction meeting(s) progress meeting(s), meeting agenda, minutes, and construction schedule. DEFINITIONS The Contract Officer (CO) executes the contract on behalf of the Government; this shall include a duly appointed successor. The Contracting Officer is the only official authorized to administer, modify and/or terminate the contract. The Contracting Officer makes related approvals, determinations, and finding pertaining to the contract and is the only individual on the project staff who can obligate funds on behalf of the Government. The FCI shall ensure a Contract Officer's Representative (COR) is present to allow access to all areas by the contractor. The COR will be located at the project site and has overall responsibility for the administration of the operations and activities at the project site. The COR represents the Contract Officer for all technical matters that arise under the contract. The COR will evaluate the contractor's performance and prepare a performance report at the end of the contract. The Contract Officer Representative (COR) shall not and has no authority to re-delegate authority to any other person, change or modify any terms of the contract, obligate the payment of any money by the Government and/or cause the contractor to incur cost not otherwise covered by the contract. The contractor shall provide to the Contract Officer, (3) three copies of the safety data sheet (SDS) on all materials and substances that may be used during the project. In the event the Institution Safety Manager does not approve the material, it shall be the responsibility of the Contractor to locate and procure an alternative product. OTHER CONSIDERATION Lost time due to security restrictions/considerations: contractors should plan for a certain amount of time accrued for security considerations, i.e., base security checkpoint, check in screening, delays due to inmate movements, institution lockdowns, institution emergencies, institution counts etc. In the event of an institutional emergency, the Contractor will be instructed to secure and stow all tools, equipment and materials, and contractor will be escorted off the institution grounds. Work will be suspended until the institution emergency passes. The work location is considered inside the confines of the secure institution. The institution reserves the right to suspend work for any reason listed above. Contractor will NOT be allowed to bring weapons, cell phones or any other objects that violate criminal laws or are prohibited by Federal regulations or Bureau of Prisons policies on institution grounds. The Contractor shall be responsible for removing all waste from the institution grounds and disposing of in accordance with all federal, state, and local regulations. INSTITUTION SECURTIY The Contractor agrees to adhere to all regulations as outlined in HSPD-12 (Homeland Security Presidential Directive), agrees to adhere to all regulations prescribed by the institution for safety, custody and conduct of staff, contractor workers and inmates. The contractor will be required to complete a limited background investigation through the National Crime Information Center (NCIC). The Contractor may at any time be removed from the institution grounds at the discretion of the Warden. PAYMENT TERMS The Contractor must provide a means for electronic payment to include bank routing and account number, payment terms are specified in FAR 52.212-4(g). The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C 3903 and prompt payment regulations at 5 CFR part 1315). The Contractor can however offer discount payment terms for prompt payments as specified in block 12 on the SF 1449 form of this solicitation. Partial or half sessions will not be authorized for payment. AT THIS TIME WE DO NOT HAVE A SITE VISIT. ALL QUESTIONS CAN BE ANSWER BY MR. ROSS BY PHONE OR EMAIL. FOR QUESTIONS: CONTACT: David Ross Engineering Technician FCI Fort Dix 5755 Hartford Road Joint Base MDL, NJ 08640 609-723-1100 x6662 EMAIL : D1ROSSBOP.GOV
Post-Bid
Jails / Prisons
$100,000.00
Public - Federal
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 9, 2024
September 16, 2024
5755 Hartford Rd., New Hanover, NJ
Related To This Project
New Hanover, NJ
Bid Date: Aug 22 2024
New Hanover, NJ
Bid Date: Sep 04 2024
New Hanover, NJ
Bid Date: Apr 03 2024
New Hanover, NJ
Bid Date: Feb 01 2024
New Hanover, NJ
Bid Date: Jan 17 2024
New Hanover, NJ
Bid Date: Feb 22 2022
New Hanover, NJ
Bid Date: Sep 01 2023
New Hanover, NJ
Bid Date: Jul 07 2023
New Hanover, NJ
--
New Hanover, NJ
Bid Date: Sep 09 2022
Elizabeth, NJ
Bid Date: Oct 02 2024
Camden, NJ
Bid Date: Oct 25 2024
Keyport, NJ
Bid Date: Sep 20 2024
Pemberton Township, NJ
Bid Date: Oct 24 2024
Elizabeth, NJ
Bid Date: Sep 25 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.