EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 18, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a playground / park / athletic field in Buffalo, New York. Completed plans call for site work for a playground / park / athletic field.

Work Included: Park improvements including pathways, electrical service upgrades, site lighting, security cameras and perimeter access controls. 1. The following as well as the current Standard Specifications for Construction and Materials, including all addenda, of the City of Buffalo Department of Public Works and New York State Department of Transportation shall become a part of and shall apply to this Contract. 2. The Contractor will not proceed with any construction until his proposed work schedule is approved by the Engineer. 3. During construction, the Contractor must provide safe access to all driveways whenever feasible. 4. The Contractor is to coordinate project activities with all public and private utilities, other contractors, private industries, the Buffalo Fire Department, the Niagara Frontier Transportation Authority, the Buffalo Police Department and/or any other public agencies in the Contract area. Prior to excavation, the Contractor shall request from all utility companies the locations of all their lines. 5. The Contractor is required to comply with current codes set forth by the Americans with Disabilities Act (ADA) at all locations requiring handicap ramps. 6. The Contractor shall repair or be responsible for all repairs made of all damages incurred by the Contractor during the construction at the Contractor's sole expense. 7. The City reserves the right to increase/decrease quantities as necessary at "no extra cost" to the City. 8. All the work will be performed under one contract. 9. Construction work hours shall be between 8:00 a.m. to 4:30 p.m. by Chapter #293 of the City Charter. 10. The Contractor shall generally limit his work days to eight (8) hours per day. Longer workdays may be permitted as necessary given permission of the E.I.C.

Post-Bid

Playgrounds / Parks / Athletic Fields

$500,000.00

Public - City

Site Work

31

16

15

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Design Data, Quality Requirements, Regulatory Requirements, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Vehicular Access and Parking, Temporary Roads, Temporary Barriers and Enclosures, Temporary Tree and Plant Protection, Temporary Controls, Temporary Storm Water Pollution Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Special Purpose Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Fill, Backfill, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
149
Bidding Soon
2,888
All Active Projects
1,111
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2024

October 21, 2024

img_map_placeholder

1978 Hertel Ave, Buffalo, NY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Shoshone Park Improvements Phase 1 Group

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.