Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
New construction of a water / sewer project in Thornton, Colorado. Conceptual plans call for the construction of a water / sewer project.
Reference Number 0000362231 Job Location: Thoronton, CO This Project includes Design Services for a new PFAS treatment facility at the Thornton Water Treatment Plant located at 920 Thornton Parkway, Thornton, CO 80229. This Project shall be delivered using the Construction Manager at Risk (CMAR) project delivery method. The Consultant's Scope of Services is included as Exhibit A. The Treatment Technology Study is attached under separate cover as Exhibit 4. The Conceptual Design Report is attached under separate cover as Exhibit 5. The Thornton Water Treatment Plant Conforming to Construction Drawings are attached under separate cover as Exhibit 6. To be minimally qualified for consideration for award, proposing firms must have successfully completed the design of a gravity filter or gravity granular activated carbon (GAC) contactor project with a minimum capacity of twenty (20) mgd as design engineer within the past eight (8) years. In addition, proposing firms must have successfully completed (construction completion) a project utilizing CMAR or progressive design-build project delivery method on a water treatment plant project with construction value of at least fifty million dollars ($50,000,000) within the past eight (8) years. Question Deadline 09/30/2024 at 5:00 PM MT Questions are submitted online No, All questions shall be directed in writing to Dennis Laurita, Contracts Supervisor, 9500 Civic Center Drive, Thornton, CO 80229-4326, fax 303-538-7556, or e-mail - Dennis.Laurita@ThorntonCo.gov Buyer Preferences, Guidelines & Requirements General Requirements - Certification/Training - Insurance Required Thornton reserves the right to reject any and all Proposals, in part or in whole, and to award the Project to the most responsive and responsible firm(s) as deemed in the best interest of Thornton; further, the right is reserved to waive any formalities or informalities contained in said Proposal(s).
Conceptual
Water / Sewer
$1,500,000.00
Public - City
New Construction
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 8, 2025
920 Thornton Pkwy, Thornton, CO
Related To This Project
Thornton, CO
Bid Date: Oct 09 2024
Thornton, CO
Bid Date: Sep 13 2021
Thornton, CO
Bid Date: Jun 27 2019
Thornton, CO
Bid Date: Sep 18 2024
Thornton, CO
--
Thornton, CO
--
Thornton, CO
Bid Date: Aug 29 2024
Thornton, CO
Bid Date: Sep 06 2024
Thornton, CO
Bid Date: Aug 28 2024
Thornton, CO
--
Thornton, CO
Bid Date: Aug 15 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.