BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Flint, Michigan. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

University of Michigan Health RAHS Armstrong Middle School DCC Construction is requesting bid proposals on behalf of Kearsley Community Schools for the buildout of an existing space into a new University of Michigan Health RAHS Clinic. The scope of work will include (but not limited to) the following: The following scope items may not align with the specific Bid Categories! Selective Demo Concrete Aluminum Storefront/Glass Painting Flooring Fire Suppression Casework/Solid Surfaces HVAC/ Plumbing Electrical/Fire Alarm Construction Timeline Work will commence Fall/Winter 2024 and is expected to be completed Winter/Spring 2025 Post bid interviews will be conducted the week of September 30th, 2024. Questions regarding the bid or contract documents shall be directed to: bids@dccconstruction.com DCC Construction, Inc. 10266 Lapeer Rd. Davison, MI 48423 1. Progress Cleanup is required every day at a minimum or as directed by DCC Construction. Cleanup includes putting away and properly storing all tools and equipment, rolling up extension cords, properly covering and storing materials waiting for installation. All garbage/dunnage/shipping materials and associated debris generated by installations is to be properly disposed within the provided dumpsters. At no time will shipping containers, crates, materials, piles of debris, tarps, boxes, etc. be left on site, unattended and unsecured, subject to unsafe conditions. Each Trade Contractor shall ensure that every work area is properly clean, organized, and safe every night. Cleanup is to be a part of the daily routine for every trade working onsite. If contractors do not maintain their work areas or provide the proper resources for our daily clean-up, DCC Construction will provide a warning to the contractor. If the problem continues after the warning, DCC Construction will provide labor and charge all costs accordingly. 2. Project Specific Safety Program o It is a fundamental value of DCC Construction that safety is always a primary consideration. It is our policy and top priority to do everything in our power to provide a safe workplace for all workers and to mandate the use of good safety practices. Adherence to established safety standards and procedures is always required of everyone on the project site. o Required site PPE includes hardhat, safety glasses, reflective clothing, long pants, shirts with sleeves, closed-toe shoes, and gloves at all times. Fall protection is required at heights more than six (6) feet. o The Project Safety Manual addresses the following topics: . Responsibility . Trade Contractor Safety Programs . Discipline Policy . Weekly Safety Meetings . Safety Inspections . Drug/ Substance Abuse Testing Program . Hazardous Material Control Program . Existing Hazardous Material . Personal Protective Equipment and Clothing . Emergency Telephone Numbers . First Aid . Injury/ Accident Reporting and Investigation . Assured Grounding Program . General Jobsite Safety Rule . Housekeeping Ancillary Safety Procedures . Tobacco Use Protocol . Crane Inspections . Visitor Policy . Fire Prevention and Protection

Post-Bid

Educational

$745,000.00

Public - County

New Construction, Site Work

35

19

8

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
75
Bidding Soon
1,322
All Active Projects
538
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2024

November 8, 2024

img_map_placeholder

6161 Hopkins Rd, Flint, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.