BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Columbus, Georgia. Completed plans call for the renovation of a educational facility.

Buyer Contact: Raymond Carrion carrion.raymond@muscogee.k12.ga.us 706-748-2585 The Project is to be performed pursuant to the AIA A133-2019 Standard Form of Agreement with payment based on the cost of work, plus a fee and with a guaranteed maximum price. The successful proposer (the Construction Manager at Risk (CM) shall serve as the contractor and construction manager for the Project. This project might include all typical construction trades, and will definitely require the following Trades: Mechanical, Electrical, Plumbing, Demolition, Painting. The services will consist of pre-construction and construction services which may proceed concurrently. Pre-construction services include cost estimating, constructability analysis and scheduling and phasing of the work. The CM will assist the School District and the Project Engineer in finalizing the phasing and scheduling of the work and value engineering of the Project. Equipment installation is to be scheduled as soon as practical for the facility, when campus is mostly vacant, possibly over our Christmas Break (12/21/24-1/5/25), or our Spring Break (3/29/25-4/6/25), or next Summer (starting 5/29/25), with Substantial Completion to occur as soon as possible, and with date to be determined (TBD) during preconstruction phase. The evaluation factors for the RFP and their relative importance are as follows: Stability of CM (20%), Relative Experience and Qualifications of CM (20%); Quality of Proposed Management Plan (15%); Past Performance of CM (20%); and Fee of CM (25%). The RFP can be obtained from the Muscogee Country School District, Office of the Director of Construction, at 5661 Lorenzo Road, Columbus, Georgia 31904. In addition, a copy will be available on the School District's website All questions or clarification concerning this RFP shall be submitted in writing to the Office of the Director of Construction of the School District. Respondents to the RFP should not contact other department heads or using agencies with questions regarding this RFP. Please use the Question/Clarification Form included herein. Responses to questions will be forwarded to all proposers. The Project Engineer for the Project is Peach Engineering, Columbus, Ga. PUBLIC INFORMATION The only information that will be available prior to the School District's awarding of a contract will be a list of proposers submitting proposals. After contract award has been voted on by the Board of the School District other information will be available. Proprietary information will not be available for public inspection. Proposers shall clearly identify such information contained in their proposal(s) and specifically the Official Code of Georgia Annotated (O.C.G.A.) Title, Chapter & Section that apply. The School District accepts no responsibility for such proprietary information being released if not clearly identified as such. All information received pursuant to this solicitation and public access to any of this information shall be in accordance with the Georgia Law. ADDENDA The proposer shall include acknowledgment of receipt of addenda (if any) in their sealed proposal. NON-COLLUSION AND EQUAL OPPORTUNITY POLICY The proposal must include a signed Statement of Assurance and Non-Collusion Affidavit in the form attached hereto as Exhibit 'A'. The proposer must also sign a Contractor Affidavit and Agreement indicating compliance with O.C.G.A. 13-10-91 (compliance with Federal Work Authorization Program), in the form attached hereto as Exhibit 'B'. TIME FOR CONSIDERATION Due to the evaluation process, proposals must remain in effect for at least 45 (forty-five) days after date of receipt. CONTRACT AWARD The Project is to be performed pursuant to the AIA A133-2019 Standard Form of Agreement, with payment based on the cost of work, plus a fee and with a guaranteed maximum price. The successful proposer shall serve as the Contractor and Construction Manager at Risk (CM) for the Project. Award of this contract will be made in the best interest of the School District. It is the intent of the School District to award this contract to one Contractor, under one contract. Proposals will be opened by the Office of the Director of Construction of the School District at 2pm, Thursday October 17, 2024. Proposals will be distributed to an Evaluation Committee who will meet to discuss and evaluate to make a recommendation of the award. INTERVIEW AND SELECTION At the discretion of the Evaluation Committee, the proposer receiving the highest score shall be interviewed by the Evaluation Committee. After the interview process, the Evaluation Committee will make a recommendation to the Superintendent of the School District for the award of the contract. PROPOSED PROJECT SCHEDULE It is the intent of the School District to award the contract for the Project within 45 (forty-five) days after the opening of the proposals. After being awarded the contract and as part of the preconstruction services, the CM will work with the School District and the Engineer to provide scheduling input and advice in finalizing the construction schedule. PROJECT APPROACH The Project Team will consist of the School District's representative, the Project Engineer and any other consultants of the School District, and the construction team of the CM, and the CM's subcontractors, all working together in a cooperative "partnering" manner. The CM will begin by performing pre-construction services with the Project Team. Services will include conceptual and detailed budgeting and estimating, constructability reviews, evaluation of alternative materials and equipment and systems for performance of the work. The CM will work with the School District to finalize the scheduling of the work. As design proceeds, the CM will also conduct a review of the plans and specifications for completeness and cost effectiveness of the details and materials shown for the work. Input from this review, with suggestions for improvement, will be provided to the School District and the Project Engineer. On completion of the plans and specifications, or at an earlier date if mutually agreed upon, the CM will develop the Guaranteed Maximum Price (GMP) for the Project. Provided that the GMP is equal to or less than the School District's approved budget, the contract amount (GMP) will be established and construction may proceed. The contract will be for the cost of the work plus a fee, with a guaranteed maximum amount. The contract will provide that all Construction Manager estimates, cost analyses, schedules, phasing plans and post-proposal pre-construction documents, and subcontractor and material supplier quotations will be available to the School District and other members of the Project Team as the School District or School District's Representative may direct. If the initial proposed GMP is greater than the School District's budget, the GMP will not be finalized until it is equal to or less than the School District's budget or adjusted budget. During the post-proposal pre-construction period, the CM will cooperate with the Project Team in determining the areas where costs are greater than the School District's budget. The CM will work with the Project Team in developing suggestions for changes to materials, building systems and/or scope needed to bring the estimates into compliance with the School District's budget. Proposers should show in their response their unique capabilities and experience that bring value to the process.

Sub-Bidding

Educational

$2,500,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
54
Bidding Soon
888
All Active Projects
507
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 17, 2024

November 18, 2024

img_map_placeholder

1400 1st Ave, Columbus, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.