BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in El Paso, Texas. Completed plans call for the renovation of a water / sewer project.

Roberto R. Bustamante Wastewater Treatment Plant Digesters 1, 2, and 3 Covers and Mixers Rehabilitation Project - Bid Package 2 - Digester 1 For questions regarding this solicitation, technical questions, or additional information, please contact Kenneth Kincaid, MGC Contractors by email kkincaid@mgccontractors.com until 2 P.M. September 16th, 2024. The method of Contractor Selection has not been Determined at this time. A. Work is described in general, non-inclusive terms as: 1. Demolition of cover, gas piping, rollers, and appurtenances for Anaerobic Digester 1. The emergency pressure relief assembly for Digester 1 are pre-purchased and in storage at the treatment plant. 2. Demolition of gas compression system for Digester 1. 3. Demolition of piping, gas mixing devices, and concrete pipe supports internal to Digester 1. 4. Removal and dewatering of residuals from the hopper of the digesters (below manway level) and cleaning of interior surfaces, including walls, floor, and appurtenances. 5. Installation of new floating covers, gas piping, slide guide system, and appurtenances, including new linear motion mixer for Digester 1. 6. Electrical construction of wiring and appurtenances for panels and controls for the new mixer. Installation of the panels will be done by others. pre-bid meeting-https://nam02.safelinks.protection.outlook.com/ap/t-59584e83/url=https%3A%2F%2Fteams.microsoft.com%2Fl%2Fmeetup-join%2F19%253ameeting_YjhjYTIwYWMtYTQwNi00NzVkLTliZGQtMTFjOGE5NmFiM2I3%2540thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%25222866ce06-920f-4e2c-8c26-0c291254ee4e%2522%252c%2522Oid%2522%253a%25220d8f6dfa-1cd9-4b20-ad80-3a87b2c45885%2522%257d&data=05%7C02%7Caleyva%40mgccontractors.com%7C08062c09b9e44f1c2f2208dcc81509ec%7C2866ce06920f4e2c8c260c291254ee4e%7C1%7C0%7C638605239899886679%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=BuLMbUukMNVR1MWw17kOqG7fi7SGI0sC3tPDX5Ts1dw%3D&reserved=0 Meeting ID: 272 039 856 486 Passcode: GwbSWC Dial in by phone +1 480-770-4656,,665783445# United States, Phoenix Find a local number Phone conference ID: 665 783 445# -OR- Copy and Paste the following address into your web browser. https://nam02.safelinks.protection.outlook.com/ap/t59584e83/url=https%3A%2F%2Fteams.microsoft.com%2Fl%2Fmeetupjoin%2F19%253ameeting_YjhjYTIwYWMtYTQwNi00NzVkLTliZGQtMTFjOGE5NmFiM2I3%2540thr ead.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%25222866ce06-920f-4e2c-8c26- 0c291254ee4e%2522%252c%2522Oid%2522%253a%25220d8f6dfa-1cd9-4b20-ad80- 3a87b2c45885%2522%257d&data=05%7C02%7Caleyva%40mgccontractors.com%7C08062c09b 9e44f1c2f2208dcc81509ec%7C2866ce06920f4e2c8c260c291254ee4e%7C1%7C0%7C638605239 899886679%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6I k1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=BuLMbUukMNVR1MWw17kOqG7fi7SGI0 sC3tPDX5Ts1dw%3D&reserved=0 Bid Package 2 - Digester 1: Work to be completed under this contract will include all items required by the contract documents provided herein, including General Conditions, Bond, Insurance, Site Supervision, Safety Measures, Site Preparation, etc. as well as, all equipment, labor, and materials to complete the following scopes of work: 1.1 Mechanical: Work to be completed under this contract will include all equipment, labor, and materials to provide a complete and functional system for Digester #1 as shown in the Contract Documents. Scope of work to include; demolition of existing gas piping and appurtenances, demo existing digester lid and appurtenances, provide and install new digester lid with all associated parts, test cover, apply all insulation and required coatings. 1.2 Electrical: Work to be completed under this contract will include all equipment, labor and materials to provide a complete and functional electrical system for Digester #1 as shown in the Contract Documents. 1.3 Digester Cleaning: All costs associated with emptying and processing and of contents of Digester #1. It shall include all materials, equipment, labor, tools, and incidentals in accordance with the Contract Documents. El Paso Water will be responsible for haul off and disposal of all processed material. 25% FOR SMALL LOCALLY OWNED BUSINESSES

GC Bidding

Water / Sewer

$300,000.00

Public - City

Renovation

42

17

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
16
Bidding Soon
390
All Active Projects
145
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.