Published November 6, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Brimfield Township, Ohio. Completed plans call for site work for a water / sewer project.

Installation and maintenance of highway and street lighting, highway and street sign lighting, electronic message boards and traffic control systems, camera systems, traffic signal work, substation and line construction including overhead and underground projects for private and industrial work as in accordance with the IBEW Constitution. This Agreement includes the operation of all tools and equipment necessary for the installation of the above projects. The Contractor shall provide all labor, material, and equipment necessary for the 2024 Sewer Maintenance Program including but not limited to: clean, video record, pipe joint air pressure test, injection grouting, cured in place sewer rehabilitation (both full length and sectional), rehabilitation sanitary sewer manholes, installation of manhole chimney seals and all incidental work required. Project located in 7ZLQ /DNHV, OH 442240 Proposals will be received for the following items of work: 2024 SANITARY SEWER MAINTENANCE PROGRAM (FRANKLIN) The Contractor shall provide all labor, material, and equipment necessary for the 2024 Sewer Maintenance Program including but not limited to: clean, video record, pipe joint air pressure test, injection grouting, cured in place sewer rehabilitation (both full length and sectional), rehabilitation sanitary sewer manholes, installation of manhole chimney seals and all incidental work required. Project located in Twin Lakes, OH 44240 Estimated Costs of Construction: 2024 Sewer Maintenance Project (Franklin): $ 460,000.00 The Contractor shall familiarize himself with all of Section 20, including 'Information and Instructions to Bidders' and 'Special Construction Requirements' prior to bidding. All questions shall be directed to the Portage County Water Resources Department in writing to mmihalich@portageco.com. The Bid Guarantee is conditioned to provide that if the Bid is accepted and awarded, the Bidder will enter into a contract with the County and will file a Performance Bond as required. The Bidder to whom the Contract is awarded will be required to furnish a Performance Bond in the sum of 100 percent of the Contract price for the faithful performance of the Contract. If the Bidder selects "Bid Guarantee" Option A, the Bidder may use this Bond as the Performance Bond. Each Proposal must contain the full name of the party or parties submitting the documentation and all persons interested therein. Each Bidder must submit evidence of its experiences on projects of similar size and complexity. The bidder shall purchase the plans and a contract book to become a qualified participant before final bid submittal. Copies of section 153.011 of the revised code can be obtained from any of the offices of the Ohio Department of Administrative Services. The Portage County Commissioners reserve the right to waive any informality or to reject any and all bids. The Owner intends and requires that the project be completed no later than two hundred and ten (210) calendar days after the "Notice to Proceed" is issued and complete restoration within thirty (30) days thereafter.

Bid Results

Water / Sewer

$459,728.00

Public - County

Site Work

7

7

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Quality Assurance, Field Samples, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Applied Fireproofing
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Panel Doors, Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Terrazzo Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Toilet, Bath, and Laundry Accessories
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Manufacturing Equipment, Manufacturing Lines and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
86
Bidding Soon
1,387
All Active Projects
602
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2024

November 1, 2024

img_map_placeholder

Multiple Locations, Brimfield Township, OH

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2024 Sanitary Sewer Maintenance Program (Franklin)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.