BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, outdoor lighting and new construction of a civil project in Memphis, Tennessee. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; for outdoor lighting for a road / highway; and road / highway.

Turner Construction (Turner), Ardmore Roderic, and Chris Woods Construction Company (A Tri-Venture), also known as TAC, was selected by Memphis Shelby County Airport Authority as the Construction Manager on the Terminal Modernization & Seismic Program, TMSP. The TMSP will modernize and seismically update the terminal buildings, which are nominally 60 years old. The preferred terminal modernization concept will ensure the terminal facilities can accommodate future demand through a flexible facility that provides modern amenities to the traveling public and meets the operational needs of the airlines, TSA, The Authority, and other airport stakeholders. The concept includes modernizing the existing facilities versus replacing them. In doing so, the desire is to build off and improve the existing infrastructure, while at the same time preserving the character of the facility. The TMSP includes expanding and modernizing MEM's terminal facilities (terminals A, B, & C) to improve life safety including ensuring seismic resiliency as well as fire protection upgrades, meet future demand, reduce environmental impacts through sustainability, improve the customer experience, ensure flexibility as operations evolve and enhance Americans with Disabilities Act (ADA) access. The project scope will: . Expand the face of the building . Relocate and reconfigure vertical circulation . Reconfigure the ticket lobby . Construct a Checked Baggage Inspection System (CBIS) . Expand the Security Screening Checkpoint (SSCP) . Construct an employee screening checkpoint . Expand bag claim and prepare an area for a future new FIS The Outer Roadway Package 2 will be the remainder of the Outer Roadway project. This will include the remaining infill of the tunnel, demolishing and rebuilding the existing outer roadway and bridge. In addition, this package will include roadway lighting, signage, pavement markings, structural steel, miscellaneous metals, etc. Contact Khalif Johnson (TAC Purchasing Manager) at 901-322-8072 kajohnson@tcco.com, if you have any questions regarding this Prequalification Application. It will be mandatory that subcontractors be prequalified with Turner prior to receiving an invitation to the RFP on this package. The Subcontractor Prequalification instructions are provided with the documents for subcontractors not already prequalified. Please note that a Prequalification Application shall be submitted in full and deemed acceptable as part of the RFP evaluation.

Post-Bid

Roads / Highways

$500,000.00

Public - County

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
28
Bidding Soon
399
All Active Projects
181
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2024

November 4, 2024

img_map_placeholder

Multiple Locations, Memphis, TN

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.